Banging my head against wall with developer | Plumbing Jobs | The Job-board | Page 2 | Plumbers Forums

Welcome to the forum. Although you can post in any forum, the USA forum is here in case of local regs or laws

Discuss Banging my head against wall with developer in the Plumbing Jobs | The Job-board area at Plumbers Forums

Common new build problem grit small stones etc more likely up against stopcock taps etc. I always use to blow the main out through a window before connecting.

To late now though and its 18 months on so past the 12 month defect period. As already stated pay me for last job before i go back. Obviously never go back and block his numbers
 
I always disconnect the main and flush through after a new connection. The guys who connect it in the road just don't care and always get grit/mud etc down the pipe.
 

Similar plumbing topics

Good stuff, yep I can’t totally relate to...
Replies
7
Views
2K
Sharp Point
S
R
  • Locked
And I've just tidied it all up. Answer's...
Replies
10
Views
2K
Dotty
D
S
My advise to anyone doubting someone they've...
Replies
6
Views
2K
S
  • Locked
If you have a blockage in a waste pipe 9 times...
Replies
15
Views
2K
bobpape
B
B
  • Locked
Bernie Dont get me wrong, I love dry drains...
Replies
6
Views
3K
bobpape
B
Back
Top