The only thing I'm wary of is the current set up is the back boiler does heating only. How comes off a cylinder with immersion.

Is this common?
 
The only thing I'm wary of is the current set up is the back boiler does heating only. How comes off a cylinder with immersion.

Is this common?
 
The only thing I'm wary of is the current set up is the back boiler does heating only. How comes off a cylinder with immersion.

Is this common?

will be a common cylinder i think heating and hot water use the same water
 
The only thing I'm wary of is the current set up is the back boiler does heating only. How comes off a cylinder with immersion.

Is this common?

will be a common cylinder i think heating and hot water use the same water
 
Are you 100% ?
Is the cylinder, square shaped?


Yes.

It's this

image.jpg

But the coil is not connected. Boiler only does ch.
 
Job completed, went well.

Saturday, removed wall unit, hung stand off kit and cored hole. Ran pipes in to loft. Decided to run all of them up as the cylinder was in the loft and the cupboard with the meter was accessible going through the ceiling so made sense. Lost time coreing the hole, think it's time for a better drill mine is on the way out and made it really hard work.

Ran hot and colds to where they needed to be and left them ready to connect Sunday so I could leave the tenant with hot water. 11 hours.

Sunday removed pump and flow and returns in living room, replaced and reconnected with new pipe. Vents fitted in loft. F and R run across loft. Gas pipe renewed and TT. Cylinder drained, H and C connected in loft. Electrics run in mini trunking around kitchen. (Most of the sockets in the flat are surface). Flue out. Timer on. Up and running 9.30 pm. 13 hours.

Back yesterday, flushed, commissioned, removed back boiler, tidied up. Paid. 6 hours.

image.jpg

Cold feed was blocked where I suspected.

image.jpg

Hardest flue hole I've cored yet
 
Job completed, went well.

Saturday, removed wall unit, hung stand off kit and cored hole. Ran pipes in to loft. Decided to run all of them up as the cylinder was in the loft and the cupboard with the meter was accessible going through the ceiling so made sense. Lost time coreing the hole, think it's time for a better drill mine is on the way out and made it really hard work.

Ran hot and colds to where they needed to be and left them ready to connect Sunday so I could leave the tenant with hot water. 11 hours.

Sunday removed pump and flow and returns in living room, replaced and reconnected with new pipe. Vents fitted in loft. F and R run across loft. Gas pipe renewed and TT. Cylinder drained, H and C connected in loft. Electrics run in mini trunking around kitchen. (Most of the sockets in the flat are surface). Flue out. Timer on. Up and running 9.30 pm. 13 hours.

Back yesterday, flushed, commissioned, removed back boiler, tidied up. Paid. 6 hours.

View attachment 28931

Cold feed was blocked where I suspected.

View attachment 28932

Hardest flue hole I've cored yet
 
Looks like you might have gone through the lintel

Also any more pics ?
 
Status
Not open for further replies.

Similar plumbing topics

C
Like my system except a longer feed pipe??
Replies
5
Views
1K
Hi All This is following on from thread I...
Replies
0
Views
636
That's my new plan Timmy, I managed to get up...
Replies
7
Views
999
    • Like
  • Locked
Hi, I recently fitted a new central heating...
Replies
0
Views
657
As long as your flow pipe is getting hot first...
Replies
5
Views
1K
Back
Top