Boiler not firing up sometimes | Boilers | Plumbers Forums
  • Welcome to PlumbersTalk.net

    Welcome to Plumbers' Talk | The new domain for UKPF / Plumbers Forums. Login with your existing details they should all work fine. Please checkout the PT Updates Forum

Welcome to the forum. Although you can post in any forum, the USA forum is here in case of local regs or laws

American Visitor?

Hey friend, we're detecting that you're an American visitor and want to thank you for coming to PlumbersTalk.net - Here is a link to the American Plumbing Forum. Though if you post in any other forum from your computer / phone it'll be marked with a little american flag so that other users can help from your neck of the woods. We hope this helps. And thanks once again.

Discuss Boiler not firing up sometimes in the Boilers area at Plumbers Forums

Status
Not open for further replies.
Messages
35
I put this problem to the forum 3 weeks age and everyone said I should get the installer back.

I did that and he could not find a problem.

I also had British gas out twice (I have a yearly maintenance contract with them) and the first man changed the motor on the Honeywell 3 port valve - result no difference. The second man changed the complete 3 port valve after checking that all the voltages were ok and again no change.

Does anyone have any ideas where the problem could be. I have updated what the fault appears to be


I have astrange problem (to me). Sometimes the new Worcester 18RI does not fire up whenI would expect it to, for example.

I sometimes get up in the morning and the heating has not come on. If I turn off the hot water using the Hive controller then the boiler fires up and the radiator start to get warm


Does this sound ok or could there be a problem.


 
sounds like something with your hive setup maybe
 
it sounds like a it could be problem with the wiring have they wired the cylinder stat correctly or is the cylinder stat faulty
 
I'll have a check but it was fine before the new boiler went in, maybe they moved a wire or something.

Thanks for your help again, I will report back with the results (one day soon hopefully)
 
I've been doing some checks of the wiring in the Honeywell junction box and I have attached a photo of the present layout

I looked at an old photo taken before the hive was fitted and the only thing that changed when the hive was fitted, was a link where the room stat was.

The only thing I can see that has changed on the new photo since the new boiler was fitted is the new brown live wire to the boiler and the grey wire from the boiler connected by chocolate block to the brown wire to the pump. (the switched live to the boiler is now black instead of brown previously)

Should there have been any other changes or links cut etc.

SEE BELOW FOR POST WITH PHOTO
 
Last edited:
I've been doing some checks of the wiring in the Honeywell junction box and I have attached a photo of the present layout

I looked at an old photo taken before the hive was fitted and the only thing that changed when the hive was fitted, was a link where the room stat was.

The only thing I can see that has changed on the new photo since the new boiler was fitted is the new brown live wire to the boiler and the grey wire from the boiler connected by chocolate block to the brown wire to the pump. (the switched live to the boiler is now black instead of brown previously)

Should there have been any other changes or links cut etc.

JB Wiring after New Boiler.jpg
 
I have been doing some more checking and reading various Honeywell documents.

Should the grey wire from the boiler that has been put into the chocolate block go into the boiler P/L terminal in the photo above, and the brown wire it was connected to, go back into the pump L terminal above. Also, should link 6 be cut.
 
I would ask them to rewire it in a normal wiring centre as it could be that one of the links that was cut originally should be whole again either that or just get them to start from scratch
 
Last edited:
I am going by the Honeywell diagram I have attached which says to do so in Note 4, now I am no expert so you could be correct
View attachment 29040


But only if your boiler requires pump overrun, it basically means that the pump runs for a short period after the heating is turned off... to take away any hot water from boiling and damaging your heat exchanger ...
 
I would ask them to rewire it in a normal wiring centre as it could be that one of the links that was cut originally should be whole again either that or just get them to start from scratch

According to the Honeywell info the correct links were cut and the only one different could be the link 6 that I mentioned
 
According to the Honeywell info the correct links were cut and the only one different could be the link 6 that I mentioned

But only if your boiler requires pump overrun, it basically means that the pump runs for a short period after the heating is turned off... to take away any hot water from boiling and damaging your heat exchange.
 
But only if your boiler requires pump overrun, it basically means that the pump runs for a short period after the heating is turned off... to take away any hot water from boiling and damaging your heat exchange.

The boiler is a Worcester 18Ri which does require pump overrun
 
According to the Honeywell instructions, boilers which require pump overrun the links 4,5&6 should be cut and the wires ( boiler = p/l ) should be connected into the terminal as well as the ( pump = l ) should be connected to the pump terminal.
 
The boiler is a Worcester 18Ri which does require pump overrun


If it requires then link 6 should be cut and wires should be connected into the terminals as shown on your previous Honeywell instructions.
 
According to the Honeywell instructions, boilers which require pump overrun the links 4,5&6 should be cut and the wires ( boiler = p/l ) should be connected into the terminal as well as the ( pump = l ) should be connected to the pump terminal.

That is what I said in post 8, I was checking to make sure i was correct
 
The pump, cylinder stat and the diverter valve are supplied pre-wired that's the dot line in your diagram.
 
All you need is a decent heating engineer as the system you have got is not complicated but may be causing confusion to folk who have looked at it since its been modified
 
Status
Not open for further replies.

Similar plumbing topics

I don't believe moving the manual lever over...
Replies
5
Views
505
You'd have to have gas meter removed if you...
Replies
19
Views
2K
Np Simon. Hoping to get the boiler engineer...
Replies
4
Views
877
G
If its not producing heat then it's not firing...
Replies
1
Views
645
Back
Top