Turn off the electric supply to the boiler at the fused spur or pull the plug at the socket.
Don't just switch off at the programmer.
With no power to the system both valves should be closed and the levers would be firm.
If one is still floppy this would indicate a fault and the micro switches contacting and would
keep firing the boiler when power restored.
Don't just switch off at the programmer.
With no power to the system both valves should be closed and the levers would be firm.
If one is still floppy this would indicate a fault and the micro switches contacting and would
keep firing the boiler when power restored.