Bonding present and before and tees, but not within 600mm from meter. | Plumbing Jobs | The Job-board | Plumbers Forums
  • Welcome to PlumbersTalk.net

    Welcome to Plumbers' Talk | The new domain for UKPF / Plumbers Forums. Login with your existing details they should all work fine. Please checkout the PT Updates Forum

Welcome to the forum. Although you can post in any forum, the USA forum is here in case of local regs or laws

American Visitor?

Hey friend, we're detecting that you're an American visitor and want to thank you for coming to PlumbersTalk.net - Here is a link to the American Plumbing Forum. Though if you post in any other forum from your computer / phone it'll be marked with a little american flag so that other users can help from your neck of the woods. We hope this helps. And thanks once again.

Discuss Bonding present and before and tees, but not within 600mm from meter. in the Plumbing Jobs | The Job-board area at Plumbers Forums

Matt0029

Gas Engineer
Messages
1,177
As the title how would people report this on a Cp12? The bondings present, visible and before any tees. However its is not within 600mm of the meter. Thanks.
 
Supposed to leave a bonding notice informing responsible person. I would note it down in your notes section. Unsafe situations procedure mentions it as does TB102.

Are you not able to move it?
 
Supposed to leave a bonding notice informing responsible person. I would note it down in your notes section. Unsafe situations procedure mentions it as does TB102.

Are you not able to move it?
Would need an electrian to join on to the clamp where it is presently and extend I would of thought. Not enough slack for me to move it. Its around 1.5 to 2 meters from the meter.
 
Would need an electrian to join on to the clamp where it is presently and extend I would of thought. Not enough slack for me to move it. Its around 1.5 to 2 meters from the meter.

Not sure it can be extended anymore, I’ve been told by our sparks it has to be a continuous loop. As it has been advised by others it appears to be ok as it’s before any branch :D
 
Not sure it can be extended anymore, I’ve been told by our sparks it has to be a continuous loop. As it has been advised by others it appears to be ok as it’s before any branch :D

Your sparks is misinformed.

Good practice says it should be continuous, but nothing in BS 7671 says it has to be continuous.
 

Similar plumbing topics

  • Question
Not all commercial boilers are 70 kwatt...
Replies
12
Views
1K
  • Locked
Re advising of no protective equipotential...
Replies
7
Views
10K
kirkgas
K
The only opening in a built in gas meter box...
2
Replies
42
Views
8K
Correct I would depending on the stop tap...
Replies
1
Views
38
  • Question
So, to close this thread the solution I found...
Replies
2
Views
680