Burst pipe under screed mystery | Plumbing Jobs | The Job-board | Page 2 | Plumbers Forums
  • Welcome to PlumbersTalk.net

    Welcome to Plumbers' Talk | The new domain for UKPF / Plumbers Forums. Login with your existing details they should all work fine. Please checkout the PT Updates Forum

Welcome to the forum. Although you can post in any forum, the USA forum is here in case of local regs or laws

American Visitor?

Hey friend, we're detecting that you're an American visitor and want to thank you for coming to PlumbersTalk.net - Here is a link to the American Plumbing Forum. Though if you post in any other forum from your computer / phone it'll be marked with a little american flag so that other users can help from your neck of the woods. We hope this helps. And thanks once again.

Discuss Burst pipe under screed mystery in the Plumbing Jobs | The Job-board area at Plumbers Forums

Yes my subbie put the Hep fittings (old 15mm copper - hep20 fitting- hep20 15mm) in the screed, and yes my first thought also was that was why it failed. However in hindsight I don't know why this should automatically be assumed as the I cannot think of a reason why it should fail in screed and not in a stud wall void.

I can understand if it was a new large screed floor because the contraction over time of the screed can cause large movements which might put pressure on the grips and seals between the fittings and pipe. But this would not occur with small screed patches as in this case. I also thought about whether natural expansion and contraction of the rigid plastic fitting in a confined screed could cause a fracture, but then 2.5 years is a long time for this to wait to happen.

What I also wondered was whether the failure of the pressure gauge might cause the homeowner to read zero pressure, and then ramp up the pressure to maximum mistakenly believing that the pressure was not rising. This might cause the weakest point in the system to fail. In an all copper system this could be the plastic to copper joint, but if this had not failed, next would have been a copper joint.
 
Screed will get into the fitting and onto the seals air in a void won’t. Think you’re clutching at straws a bit with the pressure thing as most plastic is good up to 10 bar
 
All joints were well wrapped to prevent any contamination from cement in screed. Did not think about the PRV opening at 3bar. Could it be anything to do with 1 pipe system, that was the other coincidence, first time a Hep20 joint has failed on me and first time I've had dealings with 1 pipe system?
 
I think the main issue here is
the ...sub contractor whom has not carried out the work properly...only the main contractor is really to blame and as always carries the can.
Contract and subby management is a hard learned skill no matter how good the main man might be .

Rob Foster aka centralheatking
 
Yes my subbie put the Hep fittings (old 15mm copper - hep20 fitting- hep20 15mm) in the screed, and yes my first thought also was that was why it failed. However in hindsight I don't know why this should automatically be assumed as the I cannot think of a reason why it should fail in screed and not in a stud wall void.

I can understand if it was a new large screed floor because the contraction over time of the screed can cause large movements which might put pressure on the grips and seals between the fittings and pipe. But this would not occur with small screed patches as in this case. I also thought about whether natural expansion and contraction of the rigid plastic fitting in a confined screed could cause a fracture, but then 2.5 years is a long time for this to wait to happen.

What I also wondered was whether the failure of the pressure gauge might cause the homeowner to read zero pressure, and then ramp up the pressure to maximum mistakenly believing that the pressure was not rising. This might cause the weakest point in the system to fail. In an all copper system this could be the plastic to copper joint, but if this had not failed, next would have been a copper joint.

You can sit and analyse this for hours, but plastic fittings in screed DO fail.... that’s why they say not use mechanical fittings in screed. I believe it worked it self loose due to contraction / expansion, the constant heat cycle eventually caused either a stress fracture of pushed the fitting off, different materials have differing expansion rates and create immense force. I don’t really care if your contractor is meticulous in his work ethos, he carried out a something that is not the norm to how professionals do things.
As had previously been said....’Rubbish happens’ and your tackling this problem perfectly with the customer and taking it on the chin.

And finally, anything I put in a screed or walls or underfloor, get pressure tested to confirm tightness.
 
Sounds like one you put down to experience, go on you for seeing it through. Thoses joints need a bit of room for expansion so they form a thight seal.
 

Similar plumbing topics

Thanks for the advice!
Replies
2
Views
607
  • Question
Doesn’t really answer any of my questions but...
Replies
6
Views
441
  • Question
Thanks for this. The plumber is gas safe...
Replies
17
Views
4K
Exactly and I bet they will say it’s not...
Replies
5
Views
1K
  • Question
Hello, I am just catching up on some threads...
Replies
1
Views
551
Back
Top