Clay drainage pipe advice needed | Plumbing Jobs | The Job-board | Plumbers Forums
  • Welcome to PlumbersTalk.net

    Welcome to Plumbers' Talk | The new domain for UKPF / Plumbers Forums. Login with your existing details they should all work fine. Please checkout the PT Updates Forum

Welcome to the forum. Although you can post in any forum, the USA forum is here in case of local regs or laws

American Visitor?

Hey friend, we're detecting that you're an American visitor and want to thank you for coming to PlumbersTalk.net - Here is a link to the American Plumbing Forum. Though if you post in any other forum from your computer / phone it'll be marked with a little american flag so that other users can help from your neck of the woods. We hope this helps. And thanks once again.

Discuss Clay drainage pipe advice needed in the Plumbing Jobs | The Job-board area at Plumbers Forums

Status
Not open for further replies.
T

tonyacktar

Hi all

I have been asked by a customer to cut a channel in an old clay drain pipe and build a brick chamber/manhole around it to create an inspection chamber.
I have had some advice from an old timer who told me to dig to the bottom of the pipe but not under it and backfill with concrete half way up then slice the top off with a grinder and diamond blade and then brick up.

Has anyone done anything similar? any dos and don'ts

I suggested just cutting the pipe and inserting a plastic chamber and base but the customer wants to be able to put a slipper in sometime in the future rather than dig to the bottom of the chamber.
 
The old timers idea seems about right!, but building regs will want it done how you suggested!
 
In the 70s there was a minimum size for inspection chambers, this to allow man entry access. now there is a recommended maximum size to discourage man entry access. However, ever since the advent of flexible couplings rocker pipes should be provided either side of chamber to allow for differential settlement, this because pressure from direct loading on chamber differs from that on pipe buried in ground.
Cut clay pipe, length of chamber plus 600mm, keeping cuts well clear of any collars on existing clay. Then insert 300mm plpe either side of chamber and connect to existing with neoprene couplers. Provision for future connection can be made with external backdrop capped off until required.
 
Is this drain Surface or Foul and is it Shared or for sole use by this property?

If it's Foul and shared it's now belongs to the Local water company and you can't just go cutting into it anymore.
 
Is this drain Surface or Foul and is it Shared or for sole use by this property?

If it's Foul and shared it's now belongs to the Local water company and you can't just go cutting into it anymore.

Could you give a reference for this. I have an estate near me full of 1970s pitch fibre foul drains, serving multiple properties. Tree roots, surcharge from overburden and subsidence continue to be problem. The house owners would gladly pass on the responsibility.
 
Status
Not open for further replies.

Similar plumbing topics

    • Like
  • Question
All sounds good the insuduct is a nice bit of...
Replies
15
Views
4K
It doesn’t look like the internal pipe has...
Replies
3
Views
4K
C
  • Locked
Well if that happens, I'll dig up replace...
2
Replies
27
Views
4K
cammy0102
C
  • Locked
Hi thanks all for your advice. I'm going to...
Replies
8
Views
4K
  • Locked
Having a Jimmy Saville moment then Ray?
Replies
10
Views
112
Back
Top