Hi,
Recently moved into a new house which has a Danfoss FP975 controller for Central Heating and Hotwater timings
According to the manual, it can be setup as either 5/2 (weekday/weekend) programmes or 7 individual days. The controls seem to confirm this with Day / Copy function etc
The problem I have is that when I am setting the programmes, I can only run 1 programme - it doesnt give me the option to select the individual days
I have check the switches at the back of the controller, they are both set to 7 Day. I have changed them both to 5/2 which does give me the option to set weekday/weekend programmes
I would however like to set individual days as my work shift pattern isn't the same each day / week
Any ideas as to why the controller isn't allowing 7 day programmes?
Recently moved into a new house which has a Danfoss FP975 controller for Central Heating and Hotwater timings
According to the manual, it can be setup as either 5/2 (weekday/weekend) programmes or 7 individual days. The controls seem to confirm this with Day / Copy function etc
The problem I have is that when I am setting the programmes, I can only run 1 programme - it doesnt give me the option to select the individual days
I have check the switches at the back of the controller, they are both set to 7 Day. I have changed them both to 5/2 which does give me the option to set weekday/weekend programmes
I would however like to set individual days as my work shift pattern isn't the same each day / week
Any ideas as to why the controller isn't allowing 7 day programmes?