I have to fix a new toilet to my daughter's downstairs toilet.She has just had the floor retiled. The house has piped underfloor heating. I am just a bit concerned about screwing the pan to the floor and whether the pipes will be far enough down not to worry. The previous wc was plugged and screwed down in the normal way.Any thoughts please.