I got my Gola coming up soon for level 2 is there any cd to revise just for that, ive got smart screen and moodle which is a break down on all the units, and do any of you have anything that may help.those of you that have already done would you say easy - hard

I found it quite easy. The best thing to do is go over all your modules you've done.
 
Hello everybody, I am working towards my C&G 6129 Basic Plumbing Studies Level 2. I am currently on my central heating system exam; please could everybody have ago to aswer these questions and just put down question 1 B etc... Thank you
1 In a two pipe system the
a) flow and return pipework are separated
b) flow and return pipework are mixed
c) return water is at the same temperature as the flow water
d) return water temperature is higher than the flow water.
2 Which of the following systems does the statement apply to?
‘The temperature of the last radiator on the circuit will be cooler than the first radiator.’
a) Two pipe system.
b) One pipe system.
c) Two pipe reverse return system.
d) Microbore system.
3 The
[FONT=Arial,Bold][FONT=Arial,Bold]minimum [/FONT][/FONT][FONT=Arial,Bold][FONT=Arial,Bold][/FONT][/FONT]pipe size for the primary flow and return pipework from an independent solid fuel
boiler, to a hot water storage cylinder, is
a) 15 mm
b) 22 mm
c) 28 mm
d) 35 mm.
4 What is the normal size of an open vent pipe to a fully pumped heating system, in a domestic
property?
a) 10 mm.
b) 15 mm.
c) 22 mm.
d) 28 mm.
5 The connection of an open vent pipe and a cold feed pipe, can be made to a fully pumped
system using
a) an automatic air vent
b) an injector tee
c) an air separator
d) a diverter valve.
6 A zone valve in a pumped heating circuit is designed to
a) isolate the circuit when the desired temperature is reached
b) permit the system to be heated to temperatures above 100°C
c) stop the pump vibrating on its fixing mountings
d) prevent water from the flow and return pipes mixing.
6129-207 Version A
2
7 The main purpose of the vent pipe installed on a heating circuit is to
a) fill the system with water
b) provide hot water to the feed and expansion cistern
c) introduce air into the system
d) protect the system in the event of over-heating.
Figure 1
8 Refer to Figure 1. Which one of the following components is indicated by the British Standard
symbol shown?
a) Air Inlet Valve.
b) Draining Valve.
c) Double Check Valve Assembly.
d) Pressure Relief Valve.
Figure 2
9 Refer to Figure 2. Which one of the following components is indicated by the British Standard
symbol shown?
a) Drain off valve.
b) Air Inlet Valve.
c) Servicing Valve.
d) Pressure Relief Valve.
10 With reference to hot water heating, an injector tee would be used where
a) a return pipe from a gravity fed cylinder and a return pipe from a pumped heating circuit are
combined
b) a common cold feed separates to feed the hot water storage cylinder and the heating
pipework
c) a flow pipe from a cylinder and a flow pipe from a heating circuit are combined
d) the secondary open vent pipe and the primary open vent pipe are combined.
6129-207 Version A
3
11 A mid position diverter valve
a) provides priority circulation to the hot water circuit
b) provides priority circulation to the heating circuit
c) feeds both the hot water and heating circuits simultaneously
d) is used to discharge water from the system if it overheats.
12 When fitting thermostatic radiator valves, a general principle to follow is that
a) all radiators should be fitted with thermostatic radiator valves
b) at least one radiator should be fitted without a thermostatic radiator valve
c) only radiators on a dwelling’s first floor should be fitted with thermostatic radiator valves
d) only radiators on a dwelling’s ground floor should be fitted with thermostatic radiator valves.
13 Which one of the following can be fitted with a remote sensor?
a) Diverter valve.
b) Solenoid valve.
c) Motorised valve.
d) Thermostatic radiator valve.
14 An anti-gravity valve would be fitted in a
a) pipeline where air was being drawn into a system
b) vent pipe on a fully vented system
c) cold feed pipe to stop water backing up
d) pipeline in which unwanted circulation was occurring.
15 Which one of the following components would be strapped to a hot water storage cylinder?
a) Programmer.
b) Motorised valve.
c) Automatic air release.
d) Thermostat.
16 In an indirect system of heating and hot water, which includes a cold water storage cistern and
a feed and expansion cistern
a) the water level in the feed and expansion cistern should be below that of the cold water
storage cistern
b) the two cisterns bases should be at equal level
c) the water level in the feed and expansion cistern should be above that of the cold water
storage cistern
d) the water levels in the two cisterns should be equal.
6129-207 Version A
4
17 In a combined hot water and central heating system, including a feed and expansion cistern
with gravity primaries and pumped heating circuits, the
a) warning pipe to the F & E cistern may be connected to that of the cold water storage cistern
b) water level in the F & E cistern must be adjusted to 100 mm below the float valve whatever the
final level
c) water level in the feed and expansion cistern should be set to allow sufficient room for thermal
expansion
d) open vent pipe for the primary circuit may be connected into the secondary circuit.
18 The
[FONT=Arial,Bold][FONT=Arial,Bold]minimum [/FONT][/FONT][FONT=Arial,Bold][FONT=Arial,Bold][/FONT][/FONT]size of primary cold feed pipe for a hot water heating system is
a) 15 mm
b) 22 mm
c) 28 mm
d) 32 mm.
19 Before filling a central heating system for the first time, it is advisable to
a) remove all radiators and replace each with a piece of temporary piping
b) turn the pump on to assist with the filling process
c) ensure that all radiator valves are left in the closed position
d) remove the pump (accelerator) and replace with a piece of temporary piping.
20 Which one of the following assists in the removal of flux from heating systems pipework?
a) Hot flushing a system as part of the commissioning process.
b) Adding soap solution to the system after testing.
c) Setting the working system temperature above 60ºC.
d) Installing all pipes with a fall away from the drain valves.
21 Combination boilers are designed to
a) provide domestic hot water and hot water heating
b) work with two different fuels at the same time
c) provide hot water from a storage cylinder and hot water heating
d) provide hot water heating only, through any type of heat emitter.
22 Which of the following is regarded as best practice when branching a large new radiator circuit
into an existing heating circuit in cold weather?
a) Drain the system down as the first action.
b) Branch into the pipework before fitting the radiators.
c) Install the new radiators and pipework runs before branching in.
d) Install the radiators, branch into the pipework and install the new pipework.
6129-207 Version A
5
23 When fully draining down a heating system
a) all the air vents should be closed
b) the open vent pipe should be capped
c) the air vents should be opened
d) the radiator valves should be closed.
24 A dwelling installed with steel panel radiators controlled by thermostatic valves is being
decorated. The radiators will be removed one at a time as the heating is to be kept on during
the work. Which one of the following precautions should be taken before removing the
radiators?
a) Remove the head on the thermostatic radiator valve and secure the pressure pin with a
retaining cap.
b) Set the thermostatic radiator valve to the lowest setting.
c) Set the thermostatic radiator valve to its highest setting.
d) Open the air release on the radiator, remove the thermostatic valve and block its inlet port
temporarily.
25 Which one of the following heating components may have a replaceable gland packing?
a) Zone valve.
b) Automatic air release.
c) Thermostatic radiator valve.
d) Central heating pump.
26 A pump on a central heating system has been renewed on a number of occasions. Which one
of the following could be causing the fault?
a) The system cylinder thermostat operating at low temperature.
b) Air in the radiators.
c) No system by pass when fitted with thermostatic radiator valves.
d) Damaged cylinder coil.
27 Which one of the following could be fitted in the pipeline to prevent unwanted circulation in
heating system pipework?
a) An anti-gravity valve.
b) A diverter valve.
c) A double check-valve.
d) A three way valve.
 
1 Ina two pipe system the

a)flow and return pipework are separated
b)flow and return pipework are mixed
c)return water is at the same temperature as the flow water
d)return water temperature is higher than the flow water.

2Which of the following systems does the statement apply to?
‘Thetemperature of the last radiator on the circuit will be cooler than the firstradiator.’

a)Two pipe system.
b) One pipe system.
c)Two pipe reverse return system.
d)Microbore system.

3 Theminimum pipe size for the primary flow and return pipework from an independentsolid fuel boiler, to a hot water storage cylinder, is
a)15 mm
b)22 mm
c)28 mm
d)35 mm.

4What is the normal size of an open vent pipe to a fully pumped heating system,in a domestic property?
a)10 mm.
b)15 mm.
c)22 mm.
d)28 mm.

5The connection of an open vent pipe and a cold feed pipe, can be made to afully pumped system using
a)an automatic air vent
b)an injector tee
c)an air separator
d) adiverter valve.

6 Azone valve in a pumped heating circuit is designed to

a)isolate the circuit when the desired temperature is reached
b)permit the system to be heated to temperatures above 100°C
c)stop the pump vibrating on its fixing mountings
d)prevent water from the flow and return pipes mixing.


7The main purpose of the vent pipe installed on a heating circuit is to

a)fill the system with water
b)provide hot water to the feed and expansion cistern
c)introduce air into the system
d)protect the system in the event of over-heating.

Figure1
8Refer to Figure 1. Which one of the following components is indicated by theBritish Standard symbol shown?

a)Air Inlet Valve.
b)Draining Valve.
c)Double Check Valve Assembly.
d)Pressure Relief Valve.

Figure2 9 Refer to Figure 2. Which one of the following components is indicated bythe British Standard symbol shown?

a)Drain off valve.
b)Air Inlet Valve.
c)Servicing Valve.
d)Pressure Relief Valve.

 
10With reference to hot water heating, an injector tee would be used where

a) areturn pipe from a gravity fed cylinder and a return pipe from a pumped heatingcircuit are combined
b) acommon cold feed separates to feed the hot water storage cylinder and theheating pipework
c) aflow pipe from a cylinder and a flow pipe from a heating circuit are combined
d)the secondary open vent pipe and the primary open vent pipe are combined.

11 Amid position diverter valve

a) providespriority circulation to the hot water circuit
b) providespriority circulation to the heating circuit
c)feeds both the hot water and heating circuits simultaneously
d)is used to discharge water from the system if it overheats.

12When fitting thermostatic radiator valves, a general principle to follow isthat

a)all radiators should be fitted with thermostatic radiator valves
b)at least one radiator should be fitted without a thermostatic radiator valve
c)only radiators on a dwelling’s first floor should be fitted with thermostatic radiatorvalves
d)only radiators on a dwelling’s ground floor should be fitted with thermostaticradiator valves.

13Which one of the following can be fitted with a remote sensor?
a)Diverter valve.
b)Solenoid valve.
c)Motorised valve.
d)Thermostatic radiator valve.

14An anti-gravity valve would be fitted in a
a)pipeline where air was being drawn into a system
b)vent pipe on a fully vented system
c)cold feed pipe to stop water backing up
d)pipeline in which unwanted circulation was occurring.

15Which one of the following components would be strapped to a hot water storagecylinder?
a)Programmer.
b)Motorised valve.
c)Automatic air release.
d)Thermostat.
 
Hi Steveb

I have done! I've passed all my exams up to yet and revisied properly for each one. The only thing is that other students im my class are falling behind and i am the only one who has passed all my exams so far, first time. And for my tutors its quite hard for them to sit with only 1 me alone to cover the modual. I dont want to leave it too late too - n ur right i should revise
 
Hi everybody again,

Is there anybody who is registered with C&G SmartScreen because I need the exam papers which are on there 6129 level 2 central heating onces. My smartscreen has been expired. Could somebody email me them there should be two paper 1 and paper 2. Thank you
 
Hi everybody again,

Is there anybody who is registered with C&G SmartScreen because I need the exam papers which are on there 6129 level 2 central heating onces. My smartscreen has been expired. Could somebody email me them there should be two paper 1 and paper 2. Thank you

How has it expired. If your a student it's part of your course?
 
Smartscren emailed my tutor and said that the college will have to register again, I don't know why though! If any body could get on to smart screen 6129 basic plumbing studies level 2 there are two exam papers on central heating with the answers on them, could some body email them to me [email protected]
thanks
 
the benefit of using smart screen is that it is just like a mock practice on line of taking the gola exams, that is the point.
The answers to the questions that you seem so much in need of ( from this thread and others ) are in your jtl book and what you cover at college. when you sit the actual tests there are always going to be questions that you did not cover, that you have not memorised. 2 answers out of 4 are usually silly anyway. researching the complete subject rather than being given all the answers is what you need to do.
 
if you want to earn that £50k all plumbers are on you will have to put that little effort in jtl book
 
50K :)
I'm revising hard honestly can somebody help me out with these questions
14) A I THINK
15) B I THINK

14An anti-gravity valve would be fitted in a
a)pipeline where air was being drawn into a system
b)vent pipe on a fully vented system
c)cold feed pipe to stop water backing up
d)pipeline in which unwanted circulation was occurring.

15Which one of the following components would be strapped to a hot water storagecylinder?
a)Programmer.
b)Motorised valve.
c)Automatic air release.
d)Thermostat.
 
50K :)
I'm revising hard honestly can somebody help me out with these questions
14) A I THINK
15) B I THINK

14An anti-gravity valve would be fitted in a
a)pipeline where air was being drawn into a system
b)vent pipe on a fully vented system
c)cold feed pipe to stop water backing up
d)pipeline in which unwanted circulation was occurring.

15Which one of the following components would be strapped to a hot water storagecylinder?
a)Programmer.
b)Motorised valve.
c)Automatic air release.
d)Thermostat.

Back to the revising me thinks!
 
whitch type of boiler requires cold water storage cistern, feed and expansion cistern and hot water storage vessel?
Back boiler
condensation
combi
room-heating

i would go with back boiler what do you think
 
Please could somebody help me out with the questions below i have Bold in the right answer i think

Inan indirect system of heating and hot water, which includes a cold waterstorage cistern and a feed and expansion cistern


a)the water level in the feed and expansion cistern should be below that of thecold water storage cistern
b)the two cisterns bases should be at equal level
c)the water level in the feed and expansion cistern should be above that of thecold waterstorage cistern
d) the water levels in the two cisternsshould be equal.

2The connection of an open vent pipe and a cold feed pipe, can be made to afully pumped
systemusing
a)an automatic air vent
b)an injector tee
c) an air separator
d) adiverter valve.

3Which of the following is regarded as best practice when branching a large newradiator circuit into an existing heating circuit in cold weather?

a)Drain the system down as the first action.
b)Branch into the pipework before fitting the radiators.
c) Install the new radiators and pipework runsbefore branching in.
d)Install the radiators, branch into the pipework and install the new pipework.

4When fully draining down a heating system

a)all the air vents should be closed
b)the open vent pipe should be capped
c) the air vents should be opened
d)the radiator valves should be closed.

5 Tosatisfy regulations, the controls required for a fully pumped heating system(hot water priority) using a zone valve arrangement, consists of

a)two number 2 position diverter valves, time clock, cylinder thermostat, roomthermostat
b) 3port valve, programmer, room thermostat, cylinder thermostat, TRVs
c) 2 port valve, time clock, roomthermostat, cylinder thermostat, TRVs
d) 2port valve, room thermostat, cylinder thermostat.


6The cold water supply to a fully pumped open vented central heating systemshould beisolated at the

a)stop valve to the incoming cold water supply pipework
b)fullway valve on the cold feed pipework from the F & E cistern
c)service valve to the float operated valve to the CWS cistern
d) service valve to the float operated valveto the F & E cistern.

7 Onan open vented fully pumped system, positioning the pump between the cold feedand vent would

a)mean installing a three port motorised valve on the primary flow
b)increase the efficiency of the central heating system
c) result in water pumping over the ventto the F & E cistern
d)result in water pumping over the vent to the CWS cistern.
 
1. incorrect
2. yes
3. incorrect
4. yes
5. incorrect
6. yes
7. yes

you're getting better but still need to do some reading
 
this 1 should it be

a

16 In an indirect system of heating and hot water, which includes a cold water storage cistern and
a feed and expansion cistern
a) the water level in the feed and expansion cistern should be below that of the cold water
storage cistern
b) the two cisterns bases should be at equal level
c) the water level in the feed and expansion cistern should be above that of the cold water
storage cistern
d) the water levels in the two cisterns should be equal.
 
hi again

The most efficient way of draining a single radiator when removing it from the first floor of a dwelling is to:

1 Isolate the valve and drain down the radiator or

drain down the system as far as the first floor
 
question 2 answer: Isolate the valve and drain down the radiator

question 1 answer:
and the water level in the feed and expansion cistern should be below that of the cold water
storage cistern

 
Status
Not open for further replies.

Similar plumbing topics

It’s more of a thing in commercial eg dead...
Replies
7
Views
2K
S
Hi, I am a level 2 plumbing student of London...
Replies
0
Views
718
Saadudeen Abdulwaheed
S
You need to ask the college where you are...
Replies
3
Views
2K
O
  • Article
Are at home Level 2 courses actually viable...
Replies
0
Views
219
OLG0824
O
  • Question
Might be an air gap built in to the washing...