Hi all doing a landlords cert on hob in place, it's a shop put all 5 burners on and getting 24mb at meter not got the adapter to check on hob it's self I no it's 21 plus minus 2 so should I get Transco out,it goes off the meter in 22mm then into 28mm strangely for about 6 meters then back to. 22mm for a meter then ends with 2 meter of 15mm. Any advice appreciated dont do that much with hobs and don't want to shut the shop from cooking if I'm bring over the top. Cheers Martyn.