Bibbs118
Gas Engineer
- Messages
- 141
Ok, so if your in the Gas Safe forum you can view my worst week ever. One of the jobs that went wrong in that week was a basic rad single panel for double swap, should have been nice and easy, plenty of movement on the 10mm pipe.
Only it went wrong because I turned up with a 600w by 400h rad as opposed to a 400w by 600h rad. It's a school boy error I know, but I asked my mate about which come first, H or W, and he replied,
" in the house and up the stairs"
ie, W first then H.
Anyway, today I turn you with the correct rad and the job goes great .
But, I find thing (see pic) and I swear to my God I installed a 400w by 600h rad, I bolted it to the side of kitchen cupboard.
So which is it? Width first height 2nd or height first width 2nd?
Only it went wrong because I turned up with a 600w by 400h rad as opposed to a 400w by 600h rad. It's a school boy error I know, but I asked my mate about which come first, H or W, and he replied,
" in the house and up the stairs"
ie, W first then H.
Anyway, today I turn you with the correct rad and the job goes great .
But, I find thing (see pic) and I swear to my God I installed a 400w by 600h rad, I bolted it to the side of kitchen cupboard.
So which is it? Width first height 2nd or height first width 2nd?