Hi
Many years ago I upgraded my house to 3 showers, had a megaflow and worcester greenstar 24i fitted, and upgraded external connection coming into the house, had 3 showers running lovely, no problems with pressure nor flow and no system hiccups. Love the system. I have just bought a old house, which has a fairly new combi (32kw Ideal max Vogue fitted), it looks a pretty decent boiler, but I am planning on an extension in about a year, which will have two new bathrooms. For now though I want to run 1 Bathshower, one showeroom, and a downstairs shower, plus central heating. There is no cylinder, so for now it may be ok. How could I upgrade the system rather than replace a boiler still under warrantly to cope with at least another ensuite in the loft and further rads, will eventually have at least 11? I dont want cold trickling showers when the kids all decide at the same time they need a shower (which they often do at the moment). Or do I just go lock stock and barrel now and put in a 210 litre megaflow with perhaps a 3oi Worcester system boiler, so save addition pipework runs/costs later. All advice much appreciated.
Many years ago I upgraded my house to 3 showers, had a megaflow and worcester greenstar 24i fitted, and upgraded external connection coming into the house, had 3 showers running lovely, no problems with pressure nor flow and no system hiccups. Love the system. I have just bought a old house, which has a fairly new combi (32kw Ideal max Vogue fitted), it looks a pretty decent boiler, but I am planning on an extension in about a year, which will have two new bathrooms. For now though I want to run 1 Bathshower, one showeroom, and a downstairs shower, plus central heating. There is no cylinder, so for now it may be ok. How could I upgrade the system rather than replace a boiler still under warrantly to cope with at least another ensuite in the loft and further rads, will eventually have at least 11? I dont want cold trickling showers when the kids all decide at the same time they need a shower (which they often do at the moment). Or do I just go lock stock and barrel now and put in a 210 litre megaflow with perhaps a 3oi Worcester system boiler, so save addition pipework runs/costs later. All advice much appreciated.