But that's only if you can't get anyone around you
And I like good materials witch is not cheap
 
Gray0689 well i can't vouch for any builder as you must also know!...the cylinder will be going on the ground floor ontop of the concreted soild floor which will be the whole of the ground floor and then liquid screeded.
the materials that your refering to i would have to get anyway with this plumber of mine
see what vern says and give me a quote then :(
 
Jeez Papa edit post 97 before someone quotes it!
lmao at Gray....when's it starting? seriously booked up to new year already just a few odd days here and there....2 nd baby due December, retaking all my ACS JAN......Feb any good?
 
noooooooo i'm looking at maybe mid next year!... sorry should have mentioned it earlier!....but what about a quote first guys before i pull my pants down and bend over!......lol
 
Forward on a copy of that plumbers quote so I can see what he saying papa
 
noooooooo i'm looking at maybe mid next year!... sorry should have mentioned it earlier!....but what about a quote first guys before i pull my pants down and bend over!......lol

Depends you blonde or brunette? :shocked3:
 
Gray0689 the plumber will only commit to hard copy quote if i want to go ahead with the quote discussed verbally. so don't have anything on paper i'm afraid. but it is as per i've listed previously (posts 82 and 95).
 
Last edited by a moderator:
So it's £10.5k exclusive of vat for labour only of fitting boiler cylinder copper work for kitchen & utility all copper work for 4 times shower rooms witch will have 1x wc 1x whb & leave for shower supply underfloor installation complete commission of said boiler & cylinder.

Builder will be doing all floor insulation and tanking for liquid screed insulation round external walls for cold bridge
All soils and wastes for above kitchen utility and shower rooms & fitting of all sanitary ware
 
Gray0689 yes!... the insulation on the ground floor and tanking+screeding will be done by the builder the plumber to lay all floor panels both on the ground floor and upper floors for underfloor heating.
 
Gray0689 panels 1.jpgpanels 2.jpg
 
Aw spreader plates on first floor
You can use any kind of mat or rails on ground floor
What mate of underfloor you looking at
 
Looks grand but I would not be recommending wavin under foor heating pipe
Normally use glo myself and its 20 mm pipe not 15mm or 16mm and uponor is good stuff too
 
Emmeti and uponor are very similar
I'd go with emmeti or uponor imho
I prefer stainless metal manifolds
 
ok but i think i will go with Wavin brand :) + they have very good RF controls. one RF wiring centre per Manifold
 
Check out uponor imho C56 I76 and wireless digital controls
 
Last edited by a moderator:
i did..... i even went on you tube...... now i remeber i have heard of them...... and also remeber someone at the last PHEX show (Wembley)someone put me off of them... something about they werent that popular and that they might be going into receivership soon!
 
Status
Not open for further replies.

Similar plumbing topics

Size of bathroom 230cm x 210cm Height 230cm...
Replies
0
Views
640
T
  • Question
Sounds OK so long as the heating system is...
Replies
2
Views
377
  • Question
Looking at how you replied to ShaunCorb's...
Replies
9
Views
592
System boilers have a pressurised heating...
Replies
1
Views
337
it is brand new ( 6 months old ) Worcester gas...
Replies
2
Views
737
losing pressure