Price help £$£$£$£$£$ | Plumbing Jobs | The Job-board | Plumbers Forums
  • Welcome to PlumbersTalk.net

    Welcome to Plumbers' Talk | The new domain for UKPF / Plumbers Forums. Login with your existing details they should all work fine. Please checkout the PT Updates Forum

Welcome to the forum. Although you can post in any forum, the USA forum is here in case of local regs or laws

American Visitor?

Hey friend, we're detecting that you're an American visitor and want to thank you for coming to PlumbersTalk.net - Here is a link to the American Plumbing Forum. Though if you post in any other forum from your computer / phone it'll be marked with a little american flag so that other users can help from your neck of the woods. We hope this helps. And thanks once again.

Discuss Price help £$£$£$£$£$ in the Plumbing Jobs | The Job-board area at Plumbers Forums

Scott_D

Esteemed
Plumber
Gas Engineer
Subscribed
Messages
6,128
I am pricing a house refurb and could use a little help on the price

Large old terraced
It will have 6 bedrooms and 4 bathrooms
System boiler and 300 ltr unvented
9 Rads and 4 Towel rails
Hot and cold into the bathrooms (builder to do the bathrooms)

Around £4000 materials
Im thinking £3000 labour
I could do with the work but I dont want to end up earning next to nothing
 
any more info new install or remove and refit new? etc
 
I am pricing a house refurb and could use a little help on the price

Large old terraced
It will have 6 bedrooms and 4 bathrooms
System boiler and 300 ltr unvented
9 Rads and 4 Towel rails
Hot and cold into the bathrooms (builder to do the bathrooms)

Around £4000 materials
Im thinking £3000 labour
I could do with the work but I dont want to end up earning next to nothing
Are you just installing the cylinder and boiler?
Is there a new gas run required?
How much pipework is required?
 
around 10k

just done one all in around 2 months

400l cylinder
worcester 162
7 bathrooms

around 12-15k that was as builder supplied the big items eg boiler and cylinder
 
You need to remember you have to plumb, hot and cold to all bathrooms, full central heating, lagging, flushing, installing boiler and cylinder, wiring, perhaps a water softener etc ... it’s a lot of work
 
Just quoted on a 5 bed three bathroom refurb 40kw boiler , 250 litre unvented cylinder basic sandringham sanitary ware one walkin shower, one cloakroom all new pipework hot colds, gas, water rads upstairs underfloor on the ground floor, all copper install estimate was £12,000 labour and minimum £12,000 materials as could change , it doesn't take longer to rack up the hours on site 2 men 80 hours a week is £1500 - £1800 a week 6 weeks was my reckoning x 2. Kop
 

Similar plumbing topics

Millsy don’t under estimate the power of...