Hello,
I am thinking of feeding all rads on the ground floor through manifold and parallel connection.
- Manifold will get supply from 22mm pipes
- Hep2O/Speedfit 15mm pipes from manifold will run in continuous length (under the screeded floor) to each radiator
- Return 15mm pipe from each rad will also run in continuous length back to manifold
Reason for this approach - totally avoid any joint under the screeded floor
Is this a sound design?
P.S. - Work will be carried out by a plumber, not myself. But I just want to ensure that there are no joints under the screeded floor.
I am thinking of feeding all rads on the ground floor through manifold and parallel connection.
- Manifold will get supply from 22mm pipes
- Hep2O/Speedfit 15mm pipes from manifold will run in continuous length (under the screeded floor) to each radiator
- Return 15mm pipe from each rad will also run in continuous length back to manifold
Reason for this approach - totally avoid any joint under the screeded floor
Is this a sound design?
P.S. - Work will be carried out by a plumber, not myself. But I just want to ensure that there are no joints under the screeded floor.