This is a new area to me but anyway because API 2006 is now involved in this area (due to a product we are developing)
with Sentinel and Saint Gobain we will need to set up a specification for enginners to fit the set up.
So please - whats the qualification we will need to get from the sub contractors when it all kicks off after Easter 2013
Install - New wet type solar panel, a few pipes and wires down to a 3 coil hot water cylinder (and back) pump and pressure vessel
control box etc
Father Xmas - aka CHK - ho ho ho
with Sentinel and Saint Gobain we will need to set up a specification for enginners to fit the set up.
So please - whats the qualification we will need to get from the sub contractors when it all kicks off after Easter 2013
Install - New wet type solar panel, a few pipes and wires down to a 3 coil hot water cylinder (and back) pump and pressure vessel
control box etc
Father Xmas - aka CHK - ho ho ho