System upgrade unvented etc | Plumbing Jobs | The Job-board | Plumbers Forums
  • Welcome to PlumbersTalk.net

    Welcome to Plumbers' Talk | The new domain for UKPF / Plumbers Forums. Login with your existing details they should all work fine. Please checkout the PT Updates Forum

Welcome to the forum. Although you can post in any forum, the USA forum is here in case of local regs or laws

American Visitor?

Hey friend, we're detecting that you're an American visitor and want to thank you for coming to PlumbersTalk.net - Here is a link to the American Plumbing Forum. Though if you post in any other forum from your computer / phone it'll be marked with a little american flag so that other users can help from your neck of the woods. We hope this helps. And thanks once again.

Discuss System upgrade unvented etc in the Plumbing Jobs | The Job-board area at Plumbers Forums

Status
Not open for further replies.

gingalig

Gas Engineer
Messages
217
Right, ok folks this could be a long one so please bear with me,
I've been asked to replace a currently vented cyclinder with a new Unvented ( I'm G3 so dont worry,) as well as a bringing up to spec the rest of the system it has 16 rads and 3 bathrooms, its a pretty big sprawling house and the upstairs hot water pressure is rubbish as well as what look like aspestos F&E tanks in the loft, there is currently an external 26kw Grant oil boiler and what must at least a very agricultural looking 5000lt single skin tank with pretty much no seperation distances to non fire rated buildings and fences. ( Its currently supplying an ancient WB boiler in the attached annexe as well as the external one for the house)

I've done the calculations including the annexe, and if I have them right the boiler should be a touch over 32Kw I'm thinking a Grant 26/36 external for ease of fitting and cost, and not having to renovate the only other available space if it were to be an internal boiler. I am also proposing a 250lt megaflow cylinder which is possibly a bit oversized but the run from the cyclinder to to boiler is quite a stretch and I'm a bit concerned about recycle times if the house is busy. I've been looking at a Tuffa 1350 ltr 60 min fire rated oil tank which is LABC approved but not Oftec, I spoke to Oftec and they say if it passes building control It should be fine.
( anyone have any experience of these ?? ) I have warned the owners that the current showers, pipework and fittings may not be up to the job. I would be powerflushing and fitting a magnetic filter.

Looking at the existing system and pipework its a right mish mash with drop downs from all over the place although the radiators are all pretty new, I think it would be pretty difficult to zone effectivley with out completley re-pipeing it. At the moment it has an on/off basic timer with no room stat. I was thinking about Evohome but have never fitted one and would like to know if this is something that would be recomended and whether it would comply to Part L1b if it was required, as it seems to control individual radiators. On other minor worries and concerns I was also thinking about installing a timed recirculating pump for the hot water and possibly a secondary pump on the central heating system ??

This will be my biggest job to date and I dont want to cut corners, or for it not to work effectivley. Any thoughts comments and ideas are welcome and indeed looked for, keep it clean gents, thanks in advance ;-)
 
What's the incoming flow and pressure?
 
Ideally you need 20+ litres a minute and a dedicated 22mm minimum supply from the rising main you will not be able to supply 2 showers if you dont , i would allow a couple of extra days for any unseen problems you may encounter . Kop
 
I'm thinking an accumulator would probably be a good add on, although I'm beginning to head into uncharted territory. I'll go back and check there is no restriction on the incoming supply, the customer is very keen for mininmun upheaval although you cant make an ommlette with out cracking eggs so to speak. My main concern once i've ironed out the supply side of things is the zoning and whether I have to re pipe the main of the existing or can utilise whats there.
 
Status
Not open for further replies.

Similar plumbing topics

whats your budget ben?
Replies
1
Views
1K
Thanks mate. Watching the boxing at the...
Replies
16
Views
3K
The only opening in a built in gas meter box...
2
Replies
42
Views
8K
Back
Top