Today's install. | Plumbing Jobs | The Job-board | Page 3 | Plumbers Forums
  • Welcome to PlumbersTalk.net

    Welcome to Plumbers' Talk | The new domain for UKPF / Plumbers Forums. Login with your existing details they should all work fine. Please checkout the PT Updates Forum

Welcome to the forum. Although you can post in any forum, the USA forum is here in case of local regs or laws

American Visitor?

Hey friend, we're detecting that you're an American visitor and want to thank you for coming to PlumbersTalk.net - Here is a link to the American Plumbing Forum. Though if you post in any other forum from your computer / phone it'll be marked with a little american flag so that other users can help from your neck of the woods. We hope this helps. And thanks once again.

Discuss Today's install. in the Plumbing Jobs | The Job-board area at Plumbers Forums

Status
Not open for further replies.
On second thoughts, he's taken an old Diplomat out of a demolition job, and now he's going to wall hang the beast, and get another 40 years out of it. :)

Apart from the wall-hanging part, thats probably not as silly as it sounds. :)
 
Ps nice work but York bottom clip on the horizontal run is on the pull bend and at an angle -1 point
 
Nice job ,, Can't see the balance valve on the cylinder return , !!!

Under Part L balance valves shouldn't be fitted to the hot water primaries. The balancing valve is to ensure that there is capacity to run the heating and hot water at the same time. Modern control systems allow the water heating to be timed earlier than the heating which enables a quicker more efficient heat up time with no detrimental effect on the heating.

i reckon it's an Apollo Fanfare being fitted.
 
yep should have one on coil flow pal, all covered in MI's

"it is reccommended that an air bleed point or automatic air vent is incorporated in the primary return pipework close to the megaflow eco unit"

surley my vent near the boiler should suffice? What would everyone else do?
 
Vent on flow and return next to unvented cylinder and vent on flow to vented cylinder !
Vent I use is manual not automatic on sealed systems !
vent on open vent I use are automatic
 
"it is reccommended that an air bleed point or automatic air vent is incorporated in the primary return pipework close to the megaflow eco unit"

surley my vent near the boiler should suffice? What would everyone else do?

what i would do is loose no sleep what so ever over an air vent
 
ImageUploadedByTapatalk1361472270.518969.jpg

And the winner of 4 kazillion points is...... Gasmanrob.


Clapclapclapclapclap.
 
And before you Lot start going on this was before the condensate was finished.
 
Pahah that's why the apprentice nearly cut his finger off today!
 
Did you use a level on the dhw drawoff or is it my computer screen....Ive learned a valuble lesson over the last few days, Never ever post pictures too you lot haha. well done whn1. brave lad :wink5:
 
Last edited by a moderator:
Status
Not open for further replies.

Similar plumbing topics

    • Like
  • Question
Definitely not worrying about nothing. The...
Replies
2
Views
497
Id say recal at that price....as soon as it...
Replies
5
Views
742
Morning All, I have 1800’s farm house 3...
Replies
0
Views
907
  • Question
If rainwater pipe discharges to a combined...
Replies
2
Views
762
Need a heating engineer in Central London I...
Replies
0
Views
931
Back
Top