Today's install. | Plumbing Jobs | The Job-board | Page 6 | Plumbers Forums
  • Welcome to PlumbersTalk.net

    Welcome to Plumbers' Talk | The new domain for UKPF / Plumbers Forums. Login with your existing details they should all work fine. Please checkout the PT Updates Forum

Welcome to the forum. Although you can post in any forum, the USA forum is here in case of local regs or laws

American Visitor?

Hey friend, we're detecting that you're an American visitor and want to thank you for coming to PlumbersTalk.net - Here is a link to the American Plumbing Forum. Though if you post in any other forum from your computer / phone it'll be marked with a little american flag so that other users can help from your neck of the woods. We hope this helps. And thanks once again.

Discuss Today's install. in the Plumbing Jobs | The Job-board area at Plumbers Forums

Status
Not open for further replies.
could any one explain to me what does this mean ?

It's hard to explain Stan.

To me, it's someone who takes too much pride in insignificant/menial jobs to make themselves feel better about their crappy existence. For instance, the guys who won't let you in the tip without a badge, just for the sake of being an arse.
 
Cheers , thanks for the explination I understand now ! In my understanding its simmilar to OCD
 
Cheers , thanks for the explination I understand now ! In my understanding its simmilar to OCD

Haha, not sure about that pal. I have a mate with OCD, he's a right nightmare sometimes, but he's not annoying on purpose.
 
jesus, only posted a picture of a cylinder install.
nearly 3000 views, (nosey buggers)and 130 replies,everybody has there 15mins of fame.lol.
bet he never bothered.
 
That is a good example, another 1, a customer of mine just moved into new house and I did some work there I then found a leak on a old boiler he said he has just took out boiler cover as he new the boiler was old...good idea, he rings b.g and the engineer comes out the next day an says the boiler isn't right, a few little not to current standrd things although the boiler is 17 years old. Then he realises he has just took the contract up an says he is not going to change the part as he new he was trying to take them for a fool, which he wasn't. It's not like the b.g engineer was paying for the part or effecting his profit/wages in the end the engineer was nasty and trying to sell a new boiler so the customer literally threw him out, and complained to which he has had the part done now and some discount. That is a jobs worth
 
That is a good example, another 1, a customer of mine just moved into new house and I did some work there I then found a leak on a old boiler he said he has just took out boiler cover as he new the boiler was old...good idea, he rings b.g and the engineer comes out the next day an says the boiler isn't right, a few little not to current standrd things although the boiler is 17 years old. Then he realises he has just took the contract up an says he is not going to change the part as he new he was trying to take them for a fool, which he wasn't. It's not like the b.g engineer was paying for the part or effecting his profit/wages in the end the engineer was nasty and trying to sell a new boiler so the customer literally threw him out, and complained to which he has had the part done now and some discount. That is a jobs worth

Thats a good example
 
See it leaking already :angel_smile: Importantly did you remember the drain of on cold and air vent Vern told you off for last time?

Looks pretty damm tidy though

No you did not Tony LOL, also it is good practice for combi inlet valve to be above the bubble, heat team will crib if they ever go UW......

Nice work though pal....
 
Pls explain Vern "combi valve to be above bubble "

If any thing goes wrong with the expansion valve or prv Stan, the whole cylinder has to be drained or more or less to the level of the valve you can see on the wall, if it is above the bubble (megaflo has internal expansion air gap so known as bubble top as are Oso cylinders, they dont require an external expansion vessel) no draining is required or very little
 
Pls explain Vern "combi valve to be above bubble "

Like this one i bashed in a nursing home, note coil AAV and DOC, also DOC on cold mains....combi vlave nice and high, you can just see secondary return on far left too :wink_smile: Megaflo2.jpg
 
Nice work! when you gonna take me on some of these jobs eh? lol

Did you have to move those Miele washers vern? Jesus they weigh a ton lol. Had to plumb a few of those in my time.
 
Good install , I understand now what you mean about the combi valve high , I could not see combi valve on Tonys . I have never had problem draining Megaflow from full to dry no more then 10 min as all comes out under this huge pressure unlike the open vent one where the doc never works or if they do cylinder will be full of lime scale
 
Nice work! when you gonna take me on some of these jobs eh? lol

Did you have to move those Miele washers vern? Jesus they weigh a ton lol. Had to plumb a few of those in my time.

Yep half inch lol, so the pipe would go into the low loss header, thing is Tom they were bolted to a steel jig, which was then rawlbolted to the floor, theres another boiler above that washer to the right, not my best work but we had limited time as we closed the home to remove a leaking ACV delta combi 55KW with package burner on the front.
 
Thats cracking stuff vern! Shame the electrics are flapping in the wind tho.

I agree pal, i will slap our subbie, to be fair the wires are cylinder stat and twin immersions as back up, this went all the way back to a 3 phase board, we were pushed for time and were all on top of one another, not good, but fun all the same.....
 
Good install , I understand now what you mean about the combi valve high , I could not see combi valve on Tonys . I have never had problem draining Megaflow from full to dry no more then 10 min as all comes out under this huge pressure unlike the open vent one where the doc never works or if they do cylinder will be full of lime scale
Had one this week Stan open vent cylinder DOC stuck solid, not the easiset postion to syphon either
 
Yeah I've seen a few like that, nightmare to fit wastes cos they're not pumped, which is why they're often raised. Even worse when they block up. I bought a Miele for my house after seeing those commercials in care homes lol. Even my little domestic one is mega heavy.
 
I use my wet vac and then stick 1m of 15mm in and attach house to it and suck it baby ........ Hate them OV cylinders but most of the time I drain one is when it goes in my van so ........ Can not complain much but its a lot easy to drain the one that has 3 bar pressure inside
 
Yeah I've seen a few like that, nightmare to fit wastes cos they're not pumped, which is why they're often raised. Even worse when they block up. I bought a Miele for my house after seeing those commercials in care homes lol. Even my little domestic one is mega heavy.
They better be Tom , for what they cost you can get : washing mashine+ dishwasher + small fridge for your beer
 
Yeah I've seen a few like that, nightmare to fit wastes cos they're not pumped, which is why they're often raised. Even worse when they block up. I bought a Miele for my house after seeing those commercials in care homes lol. Even my little domestic one is mega heavy.
aww i see no pumps eh? less to go wrong then.....
 
The pressure reducing valve is fitted as in came into the room, saved me running another 22 fo balanced cold. I will start making note of the AAV vern.... I PROMISE ;) as for the draincock I fit the one supplied, may not be able to see it in the pic.
 
New posts
Status
Not open for further replies.

Similar plumbing topics

    • Like
  • Question
Definitely not worrying about nothing. The...
Replies
2
Views
497
Id say recal at that price....as soon as it...
Replies
5
Views
742
Morning All, I have 1800’s farm house 3...
Replies
0
Views
907
  • Question
If rainwater pipe discharges to a combined...
Replies
2
Views
762
Need a heating engineer in Central London I...
Replies
0
Views
931
Back
Top