I may be being really dumb here, come across this today. ECV basically flush with the floor allthough perfectly accessible. then 2meters of lead pipe going out to the regulator through the meter sat on a shelf, then another GSR has piped 22mm away from it obviously in a strange route. Although clearly this all looks strange/wrong, I cant actually fault anything am i being stupid, it just looks so wrong?