Hi all. I'm just wondering if different people have a different method for hanging a towel rad to 1st fix vertical pipework?
Do you all just drop the rad onto the pipes and try and hold it in place whilst levelling everything up? Or if there's play in the pipe(up&down) do you hang it by measuring it all up and levelling and cut pipe to size? I'm curious as to how you all cope with the taller radiators compared to the small ones.
Do you all just drop the rad onto the pipes and try and hold it in place whilst levelling everything up? Or if there's play in the pipe(up&down) do you hang it by measuring it all up and levelling and cut pipe to size? I'm curious as to how you all cope with the taller radiators compared to the small ones.