Two boiler install:- PRV location. (Pictures) | Boilers | Page 2 | Plumbers Forums
  • Welcome to PlumbersTalk.net

    Welcome to Plumbers' Talk | The new domain for UKPF / Plumbers Forums. Login with your existing details they should all work fine. Please checkout the PT Updates Forum

Welcome to the forum. Although you can post in any forum, the USA forum is here in case of local regs or laws

American Visitor?

Hey friend, we're detecting that you're an American visitor and want to thank you for coming to PlumbersTalk.net - Here is a link to the American Plumbing Forum. Though if you post in any other forum from your computer / phone it'll be marked with a little american flag so that other users can help from your neck of the woods. We hope this helps. And thanks once again.

Discuss Two boiler install:- PRV location. (Pictures) in the Boilers area at Plumbers Forums

Status
Not open for further replies.
Thanx, thought it was the scale; Out of interest why did you increase the D2 to 28mm?
 
how did you get on today harry?
 
how did you get on today harry?

Not bad thanks Shaun - not as far as id have liked but hey ho...

managed to get most of it wired up.

condensate is done with the exception of a reducing bung.

expansion, prv and filling link are all in place but need connecting. (I followed your advice about the expansion and I think its paid off.

Tomorrow ill be finishing off the conduit and pipework and hopefully the flues.

Picture from today:

https://www.************/MCSHeating...088078497709/1315035975236246/?type=3&theater
 
Last edited:
Looking good... I normally drill the flue holes first tho, gonna get it all covered in dust now :p
 
looks ok harry, need a bit of work on the wiring tho (clips) :) but thats me being picky :D
 
Looking good... I normally drill the flue holes first tho, gonna get it all covered in dust now :p

+1 and normally boilers in the way else, unless there going straight up
 
and you a 3rd year harry ????
 
Haha, I know with the dust... but I don't mind going around with a cloth and some brasso

Im hoping to get all of the wires into the adhesive conduit like I have done with some of it.. I ran out as I only ordered 1 length.. doh...

been doing this since I left school at 18, didn't fancy Uni so got a trade and haven't looked back! I'm 21 now.
 
Im going to run the pump live behind pipes and in conduit as i can forsee a towel being hung on it and getting a call to NO CH/HW as the pump has been un plugged...
 
Im going to run the pump live behind pipes and in conduit as i can forsee a towel being hung on it and getting a call to NO CH/HW as the pump has been un plugged...

Wire going to be long enough and how did you like the pump plug :D
 
Iv done quite a few of the new pumps tbh, they seem to be copying the region 5 way connectors in a way.

solving a problem that never existed...

Yep but can be a pain sometimes like the old grund not enough space in cable retainer
 
Tbh mate you have done very well you had any help ?
 
Tbh mate you have done very well you had any help ?


Thanks, not had any hands on help other than the kind advice on here.

Iv done a tonne of boiler swaps, my normal day to day is service and repair so I get to see good and bad installs of other people.

its been a nice change doing this.
 
Only 3 years in and you are producing work like that! Very nice. Fair play to you for doing such a nice job and also for asking advice where needed.

You, and whoever taught you should be proud.
 
Only 3 years in and you are producing work like that! Very nice. Fair play to you for doing such a nice job and also for asking advice where needed.

You, and whoever taught you should be proud.


Thanks, I was apprentice with one of the best guys in our area, and Iv been doing bits and bobs with my dad since I was about 7
 
Got the flues in today, took a while because of the old victorian crumbly walls...

Finished the conduit off and wired the permanent live in from switch fuse spare (which turned out to be faulty after an hour of testing...)


Tommorow Ill be finishing off! , got a lad coming to commision the unvented first thing so we can sign it off!
 
Got the flues in today, took a while because of the old victorian crumbly walls...

Finished the conduit off and wired the permanent live in from switch fuse spare (which turned out to be faulty after an hour of testing...)


Tommorow Ill be finishing off! , got a lad coming to commision the unvented first thing so we can sign it off!

all lies unless you have pics :D
 
https://m.************/MCSHeating/p...5958911810619/?type=3&source=48&ref=bookmarks



https://m.************/MCSHeating/p...5962741810236/?type=3&source=48&ref=bookmarks
 
Status
Not open for further replies.

Similar plumbing topics

let it cool down first then try it
Replies
9
Views
945
200% won’t be the reason the cylinder isn’t...
Replies
10
Views
1K
Again, ongoing thanks. I'll have to get to my...
Replies
18
Views
2K
  • Locked
Hello, looking for a heating engineer to...
Replies
0
Views
769
You will need a check valve to stop reverse...
2 3
Replies
61
Views
7K
Back
Top