Will this work and are there any known problems?? as this seems the most practical way of doing a Y plan to combi conversion when siting the boiler in the loft?
CH
Combi in loft, Connect flow to flow pipe (b port inlet), connect return to return off cylinder (or try and locate flow & return microbore manifold). Cold feed already in loft for combi. Cap off flow and return on reg boiler.
HW
Connect DHW feed off combi to existing hot distribution pipe off cylinder. Cold feed already in loft for Combi.
Obviousley remove existing Y plan system, tanks and cyllinders.
Will be having a mixer shower, so dedicated hot feed for shower with machine bends only.
Cheers
CH
Combi in loft, Connect flow to flow pipe (b port inlet), connect return to return off cylinder (or try and locate flow & return microbore manifold). Cold feed already in loft for combi. Cap off flow and return on reg boiler.
HW
Connect DHW feed off combi to existing hot distribution pipe off cylinder. Cold feed already in loft for Combi.
Obviousley remove existing Y plan system, tanks and cyllinders.
Will be having a mixer shower, so dedicated hot feed for shower with machine bends only.
Cheers
Last edited: