Haven't been on for quite a while, but have a question for greater minds than mine
Have an unvented to change which is currently controlled by a 3 port, will be fitting a 2 port to the flow when cylinder is changed
Apart from changing to S plan (which isn't really an option) how do I wire the 2 port into the existing 10 way and hi limit stat
Gracias in advance
BTW I am G3, don't know why I can't access that part of the forum, did send my details previously
Have an unvented to change which is currently controlled by a 3 port, will be fitting a 2 port to the flow when cylinder is changed
Apart from changing to S plan (which isn't really an option) how do I wire the 2 port into the existing 10 way and hi limit stat
Gracias in advance
BTW I am G3, don't know why I can't access that part of the forum, did send my details previously