Waiting for the water board to dig out the meter,
the owner has NOW decided to get the bathroom done, change the bath, HB and WC
He now wants a corner bath, a shower cubicle, use the old WC and HB if I can get them out without breaking them
Then tile the floor, walls, brick up a window (because of the shower)
He said it must be the taps
That wont happen for a while, I'm away on Saturday for 3 weeks
But apart from that, nothing has happened, the meter is still moving, but so slowly
Still no water showing
The kitchen fitter is still sodding about 16 days after all the flat pack arrived (must be on day work)
When anything new happens, I will let you all know
I cant see anything wrong with that picture, it keeps the kids away from the PC, I suppose, print it out and put it on the mantlepeice, it will keep them away from the fire as well
(last time I saw a tongue like that, it was in front of a door, they called it a door mat
)