3 days min I would say. I always quote assuming 4 days and often get the job. Some guys are obv a lot quicker from the sound of it!
We recommend uHeat for Underfloor Heating Systems, and The Wetroom Store for all things bathrooms and wetrooms. They provide discounts for forum members.
Welcome to the forum. Although you can post in any forum, the USA forum is here in case of local regs or laws
I'm happy with the install, I think it looks ok. It all works. If I was working for myself I'd have no problems at all. I flapped a but the first day and I was concentrating on the wrong things. Now I know where I can knock a day off if I go about it the right way. I won't be able to do it in a day, I know my boss will say to leave the cylinder but I reckon I can get done in 2.Ash are you happy with the job? Is the customer happy? Does it work?? If it ticks these three boxes that's all that matters. As others have said speed will come with practice. It's still a learning curve and I'm sure you learnt a lot on that job.
looks good to me, fair play for having the nuts to put pictures up.
I'm happy with the install, I think it looks ok. It all works. If I was working for myself I'd have no problems at all. I flapped a but the first day and I was concentrating on the wrong things. Now I know where I can knock a day off if I go about it the right way. I won't be able to do it in a day, I know my boss will say to leave the cylinder but I reckon I can get done in 2.
All i can say on this thread is i am doing something wrong, 1 day, 2 day, i would put down 3 min with day 4 available just in case.
Day if you think about it.
Do TT cap
Open hot tap. Turn off mains
Open cold tap.
Set rads away draining down
Sheet up.
Empty ch headder dregs into DHW cistern. Prop it up with ch cistern so water drains out as much as possible.
Start cutting off lagging and cut up vents. Then remove cold supply then everything else . Put all scrap in small headder. Rubbish and lagging in bigger headder. Put pushfit on outlets. Get down lift out rubbish.
Drain cylinder, while it's draining remove immersion cut out all un needed pipework. Remove cylinder bridge out and blank as req.
Carry out loot rubbish and cylinder. Cuppa.
Remove boiler and clear site for new one . Hang do flue and pipe up. Do gas first so it's cool when u do TT. Fill DHW check for leaks. Fill and vent.
Set TT away. Wire up. Check TT. Run boiler do conny and blow off while boilers getting hot. Clear up. Have lunch. 3pm ish. Commission. Come back next day and do all bits. Drain and refill system.
Don't keep going in and out of loft / work area. When u go to van carry some thing there and something back. Always think 2 steps ahead. Half lads running all over because they can't see what they are doing two moves infront.
tams advice just doesn't stop!!
Bit of 'swagger' from some of the replies on here,the truth is no job is the same,if the job went ok,customer happy,build your confidence.Truth is there is always gonna be quicker guys than you and slower guys.I bet your don't look at the urinal next to you when taking a ****...I know my boss expected it done quicker but I'm not going to flap too much about that, he knows im still learning and I have to do these jobs to learn the jobs. 12 months from now and I'll be laughing when I get a job like this.
It's experience and quality that count . Speed is for the ones on price.
It's experience and quality that count . Speed is for the ones on price.