Hi,
The kitchen/diner is going to be fitted with UFH. It will be a block and beam floor with a small later of sharp sand to level, 100mm insulation and then a 55mm anhandryte screed. Should the water feeds to the kitchen be pipe in pipe on the block/beam under/in the bottom of the insulation or in the screed layer? Is there a freezing problem below -I see a heating problem if it's in the screed because the pies will have to cross the UFH at some point.
Any thoughts welcome
The kitchen/diner is going to be fitted with UFH. It will be a block and beam floor with a small later of sharp sand to level, 100mm insulation and then a 55mm anhandryte screed. Should the water feeds to the kitchen be pipe in pipe on the block/beam under/in the bottom of the insulation or in the screed layer? Is there a freezing problem below -I see a heating problem if it's in the screed because the pies will have to cross the UFH at some point.