Hi,
Having a bit of a shocker with my current bathroom install which is leading me to question the entire work that my plumber / bathroom installer is in the middle of the job ( I posted on tiling forum the extent of the poor workmanship of tiles). Wondered the thoughts from all the pros on here for the boiler install.
This is a relocation into the loft of a new WB 18KW boiler (12 rads and hot water tank). 2 Mira Mode showers with pumps.
Doesn’t look the neatest to me, but does everything look how it should? Anything I need to chat to him about? It’s not tested or on yet so needs finalising.
I’d have expected it all to look better arranged and neater to be honest but safety is the prime concern.
Cheers,
Rob
Having a bit of a shocker with my current bathroom install which is leading me to question the entire work that my plumber / bathroom installer is in the middle of the job ( I posted on tiling forum the extent of the poor workmanship of tiles). Wondered the thoughts from all the pros on here for the boiler install.
This is a relocation into the loft of a new WB 18KW boiler (12 rads and hot water tank). 2 Mira Mode showers with pumps.
Doesn’t look the neatest to me, but does everything look how it should? Anything I need to chat to him about? It’s not tested or on yet so needs finalising.
I’d have expected it all to look better arranged and neater to be honest but safety is the prime concern.
Cheers,
Rob