B
beesley121
Hi guys,
still trying to get my head around the wiring on s plan and y plan systems
got called to a job yesterday, its an unvented cylinder and don't have my ticket for unvented so need to know if they need to get someone in that has there unvented ticket
anywsy prob is, the whole system is on a s plane, 2 x 2 port valves next to unvented cylinder. Ch 2 port valve is working as it should. Hw 2 port valve however has I power going to it when the timeclick is turned on.
not sure if this is down to the thermostat on the unvented cylinder or the time clock is faulty.
When putting the 2 port valve into the manual postion, the boiler still does not fire up. Should this not over ride it? The cylinder is a megaflo, all the electrical a are behind a grey cover. Not sure which is what so I can rule out the thermostat on the cylinder
still trying to get my head around the wiring on s plan and y plan systems
got called to a job yesterday, its an unvented cylinder and don't have my ticket for unvented so need to know if they need to get someone in that has there unvented ticket
anywsy prob is, the whole system is on a s plane, 2 x 2 port valves next to unvented cylinder. Ch 2 port valve is working as it should. Hw 2 port valve however has I power going to it when the timeclick is turned on.
not sure if this is down to the thermostat on the unvented cylinder or the time clock is faulty.
When putting the 2 port valve into the manual postion, the boiler still does not fire up. Should this not over ride it? The cylinder is a megaflo, all the electrical a are behind a grey cover. Not sure which is what so I can rule out the thermostat on the cylinder