Hey friend, we're detecting that you're an American visitor and want to thank you for coming to PlumbersTalk.net - Here is a link to the American Plumbing Forum. Though if you post in any other forum from your computer / phone it'll be marked with a little american flag so that other users can help from your neck of the woods. We hope this helps. And thanks once again.

Discuss S plan re-wire price? in the Plumbing Jobs | The Job-board area at Plumbers Forums

Status
Not open for further replies.

TFGplumbing

Plumbers Arms member
Plumber
Gas Engineer
Messages
997
Whats the going rate for a total re-wire of an S-plan with an unvented cylinder labour wise?

Good lord no.. I'am not getting some arsehole spark to do it.
 
Rewire an existing 3 hours so about 100-150 depending on what materials
From new day - day and a quarter 400 -500
 
Whats the going rate for a total re-wire of an S-plan with an unvented cylinder labour wise?

Good lord no.. I'am not getting some arsehole spark to do it.

When you say total rewire are you talking about running new cables to programmer, room stats etc etc, or just the wiring centre?

If all the cables have been run to the wiring centre, connecting up the S-plan takes minutes.
 
3 hours, seriously?

Yes

Strip out and test old cables and components 30-45 mins

Re wire cylinder stat and pump 25-30 mins

Dress and cut back valve cables/ strip new ends etc 10 mins

Wire everything up 1-1.25 hours
 
My sparky charges 4 hours plus materials.
Why bother doing it yourself?
 
Yes

Strip out and test old cables and components 30-45 mins

Re wire cylinder stat and pump 25-30 mins

Dress and cut back valve cables/ strip new ends etc 10 mins

Wire everything up 1-1.25 hours

Fair enough...
 
To move programmer to airing cupboard.
To install new programmer.
To install wiring center in airing cupboard.
To install wireless room thermostat for central heating control.
To install replacement HW zone valve.
To install replacement CH zone valve.
To wire boiler correctly.
To drain system.
To install replacement automatic air vent.
To add inhibitor to system
To re-commission & check for correct operation.
To set up suitable hot water & heating program(for prolonged efficient operation)

Existing is a total F*** up
 
Last edited:
To move programmer to airing cupboard.
To install new programmer.
To install wiring center in airing cupboard.
To install wireless room thermostat for central heating control.
To install replacement HW zone valve.
To install replacement CH zone valve.
To wire boiler correctly.
To drain system.
To install replacement automatic air vent.
To add inhibitor to system
To re-commission & check for correct operation.
To set up suitable hot water & heating program(for prolonged efficient operation)

2 days maybe you could get it done in a day and a half but you seen what needs doing go with your gut
 
A couple of days, unless you find anything else wrong ! you never know with some of these jobs
 
why you no use wiring center, what happened to the switch?

20151205_123836.jpg

Really... really?

20151205_122007.jpg

Oh its a 24I system btw
 
Last edited:
Seem hell of a lot worse.

I hate it when you see a programmer on a patress box because you know it's going to be spaghetti junction behind.
 
Had a nightmare system this week. Instead of one wiring centre there were 3 seperate wiring messes on a Y-plan system.

Boiler kept clicking when central heating was switched off. Turns out someone had wired in the pump live from the boiler and the pump neutral from the programmer. Boiler didn't like that and a relay on the PCB kept clicking as though it was sticking. Putting the line and neutral for the pump into the same box sorted it.

Very weird and was scratching my head for ages. Was about to rewire it too!
 
Had a nightmare system this week. Instead of one wiring centre there were 3 seperate wiring messes on a Y-plan system.

Boiler kept clicking when central heating was switched off. Turns out someone had wired in the pump live from the boiler and the pump neutral from the programmer. Boiler didn't like that and a relay on the PCB kept clicking as though it was sticking. Putting the line and neutral for the pump into the same box sorted it.

Very weird and was scratching my head for ages. Was about to rewire it too!
Sometimes I find it quicker to rewire them than try to fault find.
 
Status
Not open for further replies.

Similar plumbing topics

Anyway, you can always increase the boiler...
Replies
16
Views
1K
thanks.... yes, so my diagram and wording is...
2 3
Replies
55
Views
2K
Yes the stat is a dual stat. You can see it at...
Replies
6
Views
4K
There must be many installations that are in...
Replies
7
Views
921
  • Question
Im not sure tbh. What happened. I took front...
2 3
Replies
58
Views
4K
Back
Top