N
newbuild100
Long story. Im about to do a bit of work on my hot water system at home. The system whilst old, works fine but im about to replace a gate valve (to the rads) with a electrically operated valve. (If I want hot water to the rads, I simply open the gate valve which allows hot water to the CH system) Theres is a danfoss 715 timer installed to fire up the pump/boiler
Im confident of doing the pipework but ill be unsure about the wiring in the timer, when I come to wire up the new valve.
Ive made drawings of the present wiring in the timer, and have pictures.
Theres three lots of wires at present by the way, (boiler wire) (wire from a wall socket to fire the timer itself,) (and a wire to the pump)
Can anyone help re which wire (on the new valve) should go where in the timer please ??????
Much obliged
Im confident of doing the pipework but ill be unsure about the wiring in the timer, when I come to wire up the new valve.
Ive made drawings of the present wiring in the timer, and have pictures.
Theres three lots of wires at present by the way, (boiler wire) (wire from a wall socket to fire the timer itself,) (and a wire to the pump)
Can anyone help re which wire (on the new valve) should go where in the timer please ??????
Much obliged