- Messages
- 86
hi guys
I’m quoting for a job to cascade 2 boilers unvented cylinder and low loss header
To save time and distuption I’m looking to use tracpipe for the gas, the boilers are 25 meters away from the meter. I have used tracpipe for LPG but never for NG and I’m trying to find the installation volume calcs to make sure I don’t go over the 0.035 IV as I may need to install 35mm tracpipe
The boilers will be Worcester 24i system which will require 5.2m3/hr no other appliances will be installed
I’m quoting for a job to cascade 2 boilers unvented cylinder and low loss header
To save time and distuption I’m looking to use tracpipe for the gas, the boilers are 25 meters away from the meter. I have used tracpipe for LPG but never for NG and I’m trying to find the installation volume calcs to make sure I don’t go over the 0.035 IV as I may need to install 35mm tracpipe
The boilers will be Worcester 24i system which will require 5.2m3/hr no other appliances will be installed