Hi,
I've got a rewire job next week.
The current setup, old cast iron boiler with pump over run, (currently wired so pump over run isn't working).
There is a (new) 2port and pump to the cyl with cyl stat with bypass.
There is a bronze pump for DHW
There is a (big) pump for the CH. (And what I think is a commercial zone valve currently not wired in/which bypass.
At the moment it's wired that CH only works when there is a demand for HW.
I don't think the pump over run is mega important but is there a way to wire it so CH and HW can work independently, using the CH at a valve?
I'm not sure if the CH (big) zone valve is working and can't afford to replace it(currently in situ but not wired in).
To recap, what plan is a 2 pump system with a 2 port for HW called?
I've got a rewire job next week.
The current setup, old cast iron boiler with pump over run, (currently wired so pump over run isn't working).
There is a (new) 2port and pump to the cyl with cyl stat with bypass.
There is a bronze pump for DHW
There is a (big) pump for the CH. (And what I think is a commercial zone valve currently not wired in/which bypass.
At the moment it's wired that CH only works when there is a demand for HW.
I don't think the pump over run is mega important but is there a way to wire it so CH and HW can work independently, using the CH at a valve?
I'm not sure if the CH (big) zone valve is working and can't afford to replace it(currently in situ but not wired in).
To recap, what plan is a 2 pump system with a 2 port for HW called?