- Messages
- 725
Hello. Went to look at a job today. Non GSR has taken boiler off wall and left it on floor of OAP's flat. Originally a eco deal install approx 15m of pipe in 15mm 25 kw vokera and a hob. Needs gas line upgrade. Problem is 1st 3m from meter is in a wall void with compression fittings. Old lady trying to sell flat and does not want me to knock wall down to get at pipework. Not really too happy about the leaveing 1st 3 m in 15mm and upgrade rest to 28mm to get pressures as close as I can, but those fittings in a void. Was NCS but this is not a new install and not changing location and technically it is the installation of a second hand appliance. thoughts.....