No more bathrooms for me this side of chrimbo😆 I'm concentrating on smaller projects involved in two new kitchen refit jobs and doing my own one as well, a cloakroom remodel which has been a pita floor had to come up to gain access to the services heating pipe needed tidying up and first fixing ready for new designer style rad and towel rail , stopcock needed moving from the corner all services needed altering and first fixing, then studding out the wall to hide everything plasterer coming Monday so a late one for me tonight as working at home tomorrow, had to dig out the external stopcock chamber got it shut off did the alterations then couldn't get it back on ☹️Essex and Suffolk water had to come out they were first class the inspector snapped the Handle off the stopcock trying to get it turned on but had a tool to get over it replacement can now be booked for a later date. Kop