Worcester 18/25 Heat slave | Plumbing Jobs | The Job-board | Page 2 | Plumbers Forums
  • Welcome to PlumbersTalk.net

    Welcome to Plumbers' Talk | The new domain for UKPF / Plumbers Forums. Login with your existing details they should all work fine. Please checkout the PT Updates Forum

Welcome to the forum. Although you can post in any forum, the USA forum is here in case of local regs or laws

American Visitor?

Hey friend, we're detecting that you're an American visitor and want to thank you for coming to PlumbersTalk.net - Here is a link to the American Plumbing Forum. Though if you post in any other forum from your computer / phone it'll be marked with a little american flag so that other users can help from your neck of the woods. We hope this helps. And thanks once again.

Discuss Worcester 18/25 Heat slave in the Plumbing Jobs | The Job-board area at Plumbers Forums

Status
Not open for further replies.
House nearly 1000 square meters. New build. Full system, inc solar. UFH on ground floor, rad's on first/second. All zoned. Plus bathrooms. For me, that's a nice (monster) job.
Sounds nice and relatively straight forward. If you have plans do you want me to see what I'd charge as a comparison?

I'm in Machynlleth Mid Wales, no intention of trying to steal your work!
 
Id have been worried that the paperwork wasnt there. If you are commissioning then you neex the benchmark. The benchmark is in the back of the mi's. I commission a few and if its not upto spec then its on the cd11 but still registered. Roll on mid january. No more commissioning. I aint re doing my oftec.
 
I waited 20 mins for him to arrive, and I filled in the Benchmark. I was soaked, so I wrote all down and will fill in the CD11 tomorrow and post it to him.

I don't know what to do re - registering it now. As I agree with Lame in a lot of ways.

With gas work, I don't ever commision other peoples installs, but as it seems par for the course with oil (I paid for commissioning for years) I have done a couple. Only one that's not been spot on to date. Would you believe it, the client is a builder!!?
 
All this talk of £100 services, I go to about 1 at least every other month of an "engineer" that charges £40 cash to do a service. I go because within 2 months tops they break down but he tells them he doesn't do fault finding, just services.

Im im yet to actually see what he does for that money. No new nozzle or fuel hose, doesn't take the baffles out and on new boilers doesn't clean the trap.

You ou must all see chancers like this as well?
 
One of the reasons I don't do a lot on the oil side, is that I don't carry the spares. You need to carry about £250 worth of nozzles to turn up and have a a half decent chance of having the right one on board. New hoses too.

So if and when I service an oil boiler, I'll tend to pop in check what the nozzle is (normally by looking at the old one the previous engineer left) and then pop to the merchants and pick one up.

I prefer gas servicing if I'm totally honest. I charge a bit less, but it's easier.

If you don't check the baffles, change the hose, and nozzle, I think it's hardly worth it.
 
I'm hitting the sack. Knackered. Thanks everyone.

Don't know what to do now, regards registering it! Think I may pop back tomorrow. Billy, give me a bell, and we can meet there if you want. It's about ten minutes from your place.
 
Just text one of my lads as we fitted one last week in a pub. Said the CO2 was about 10.5 pre set but the pump pressure was way out, he adjusted that and it was fine. I think it may be printed wrong in the book for some of them though because he said there was an additional sheet of paper in the instructions with them all on.
 
Had abit more of a think about this!
18/25 upto 2012 had bentone burners.
after that they had riellos and a disk inside for setting but this should be in the same positions for all outputs on the 18/25

for a .65 es it should be 120 psi and 12% co2

i think they gave you the old versions info over the phone!
 
I've think you're right. It's annoying cos I won't get paid to go all the way back (an hour round trip) and it's worcester who have given me the wrong info. After I gave them all the correct info. Even gave them serial no of boiler, burner and nozzle.

So I think they should go back to put it right now. Effectively I have just been brought in to commission it and haven't been able to achieve the figures the manufacturer gave me.

Don't know your thoughts?
 
Dont the wb have the specs on the label inside? I thought they did...

Personally I wouldnt commission it, Id see the fire valve etc and give him a list of what needs doing before even getting my meter out. Id charge him £45 for my time and tell him to call when its installed to standard. When thats done Id go back and set it up.

Did you stick your probe deeply into the black hole? On the WB you need to stick it in about 4 or 5 inches to get right into the flue way to get the right readings for some reason, just through the hole wont cut it and will give you what you are experiencing.
 
I hope you checked to make sure that it was signed off by building control you will neef the number for your form or the oftec installers number otherwise you cant commission it
 
I hope you checked to make sure that it was signed off by building control you will neef the number for your form or the oftec installers number otherwise you cant commission it

if your the oftec guy commissioning it, its buildings control that wants your paperwork!
 
Extract from planning portal.
In some cases householders may decide to engage a firm that is not a member of one of the approved Competent Person schemes. In this case the installer will not be able to self-certify that their work is compliant, and the firm or the householder will need to give notice to your Local Authority of the intention to carry out the boiler work in advance, and pay a notification fee.* Local Authority Building Control may choose to check the works have been carried out to the necessary standards and may employ a registered installer to do this.When works have been completed the installer should then produce for you a commissioning certificate such as a Benchmark certificate and notify the local* authority building control department either directly, or, if a member of a* Competent Person Scheme, via the scheme operator.* In due course the local authority should supply you with a Building Regulations Completion Certificate that indicates compliance.Guidance on installing boiler and other combustion appliances, and the building provisions that are necessary to safely accommodate them (air supplies, hearths, fireplaces, flues and chimneys) can be found in*Approved Document J.
 
I hope you checked to make sure that it was signed off by building control you will neef the number for your form or the oftec installers number otherwise you cant commission it
On the CD11 its a check box that asks if the CD10 was present and completed - thats yes or no. It then asks if not, blah blah is there a building control number, yes or no.
I just tick no where appropriate. When I do the notification I just notify the commissioning, not the installation. Nothing wrong with that as far as we are concerned but I do tell the custard that the installation wont be registered and if BC come looking, your installer will have to ask for retrospective.
I ran this by by OFTEC inspector a couple of weeks ago and he confirmed thats exactly the correct route.
 
The regulations are quite precise if not approved by building control or not installed by oftec installer or othet vompetent petson then its an illegal installation and you cant commission it.
Check your building regs
 
Last edited by a moderator:
seems then that theres an awful lot of illegal installs out there, but I have yet to see anyone prosecuted as oftec is a waste of space in hunting down illegals, and BC is happy to take your cd 11 as proof the systems ok and grant a retrospective or completion notice to the householder. After all if theres anything wrong I'm not going to sign off a system, unless I am paid to bring it up to spec and then everything will comply anyhow. Not the best way of doing things but thats how it is till someone starts enforcing the so called regs.
 
We know there are a lot of illegsl installs. Manufacturers used to commission boilers that plumberd installed because they would sell more boilers. Oftec took them to task and they dont do it any more. I was at a heating show about 8yrs ago when the oftec contingent pointed out the regs
 
and in the intervening 8 years whats changed? NOTHING TO MY KNOWLEDGE

bleeding caps lock and breathe :)
 
I've had a busy day today so haven't managed to speak to the client or go back over there. I'll call him tomorrow. I'm going to fill the cd11 in. Note no fire valve. Register the boiler with Worcester Bosch and tell them to go out to it.

The don't have the figures in the boiler. Just the nozzle on the data plate.

They have me the info. Whether it was right looks doubtful.

I won't register it with building control via OFTEC until the fire valve is fitted. I think that's fair and reasonable.

The clients dad fitted the boiler and system (ex plumber apparently) so if he wants to fit a fire valve I will pop back and check its in the right position and sign it off.

I had oil boilers signed off for years. People openly advertise the service of signing off oil boilers. It's not the same as with gas. As I said I won't sign off a gas install but with oil appliances it seems common practice.
 
The regulations are quite precise if not approved by building control or not installed by oftec installer or othet vompetent petson then its an illegal installation and you cant commission it.
Check your building regs
With immense respect, I think you're mistaken. Ive just now emailed my local inspector for the 'party line' but notification of a commission isnt dependant on notification of an correct installation. This is why there are 2 separate options on the Works Notification portal. So when commissioning, you are not beholden to a notifiable install...

Reading the small print on the CD11 IMPORTANT COMMENTS:
The comments may include advice on remedial work necessary to enable the installation to comply with the requirements of the Building Regs, Control of Pollution and British Standards

So, part of the commission is to make a note of any failures to comply. I cant find anywhere that says "This installation complies with Building Regs etc.....signed...."

Im having self-doubts now about the whole procedure...
 
to show compliance with the building, health, safety and efficiency regulatory requirements and the manufacturers service
and commissioning instructions. This also enables the technician to record any
discrepancies or concerns they have with the installation as found.
Its still a bit wooly..
 
Status
Not open for further replies.

Similar plumbing topics

  • Question
Is the tank higher than the oil pump?, what is...
Replies
1
Views
213
Reply was much appreciated, thank you.
Replies
4
Views
860
Apologies for not attaching photos but many...
Replies
4
Views
680
Defo the cartridge not seating, probably had...
Replies
10
Views
1K
Back
Top