Welcome to the forum. Although you can post in any forum, the USA forum is here in case of local regs or laws

commercial pictures ?

A flow header and a return header, they are linked and pre heated by a CHP unit
The m+f Iron bends? A mapress adapter and bend and quite bulky so used them to keep it close
 
A flow header and a return header, they are linked and pre heated by a CHP unit
The m+f Iron bends? A mapress adapter and bend and quite bulky so used them to keep it close

fair enough just looks out of place esp the t
 
been fitting an ETA 350kw biomass boiler, we arent at commissioning yet butits taking shape, shame the builders didnt have a level when they put the concrete down IMAG0315.jpgIMAG0335.jpgIMAG0360.jpgIMAG0368.jpgIMG-20160418-WA0003.jpg

IMAG0315.jpg


IMAG0335.jpg


IMAG0360.jpg


IMAG0368.jpg


IMG-20160418-WA0003.jpg
 
St Peters 1.jpgJust started This one 3 ACV Prestige 120kw on cascade.
 
Last edited by a moderator:
Looks good Ch4, neat pipe and frame work.

How come there is no expansion bellows on the pumps? Are the copper lines below the pumps the returns?

I cant quite make out whats what, guessing the 54 or 67 at the bottom is flow from boiler?
 

We recommend City Plumbing Supplies, BES, and Plumbing Superstore for all plumbing supplies.

Back
Top