Welcome to the forum. Although you can post in any forum, the USA forum is here in case of local regs or laws

commercial pictures ?

Looks good miss
What you do with the old stuff


DSCF6766.jpgDSCF6767.jpg
 
Not good what a waste
Can't you recycle them
Make a bit extra then
Froling isn't cheap stuff
I agree with tamz you work is looking excellent
 
Last edited by a moderator:
tbh, it wasnt part of our contract to remove the old gear from site and we wouldnt be happy fitting a new boiler and connecting it to existing buffers etc, if they failed then it wouldnt look good for us even though it wasnt our fault.
 
The boiler itself was fine, weve done a few 200 kw frolings and they are ok, bit too fussy, but work ok. the problem with this one was the heatloads totalled 140kw and the boiler was only a 90kw, the buffers were 2x 1600ltrs which is a bit on the short side, and because of the way they designed and controlled it, the boiler was always trying to provide heat for the system running 24 hrs a day even in the summer and the buffers sat cold.
 
Hi missplumb,

I'm surprised you are still working in copper on these scale installs, I would have expected LCS given the cost! Any particular reason why?

We are on a baby Froling next week, all 15kw of it along with a colossal 500 litre buffer!
 
We've priced copper and lcs on a few jobs and there was only £500 in it. Then there is different cutter blades etc, and we get a decent price for whatever copper is left at the end of the job from the scrap man
the boiler we are doing is a tx250 with a 6000ltr buffer.
 

We recommend City Plumbing Supplies, BES, and Plumbing Superstore for all plumbing supplies.

Back