Welcome to the forum. Although you can post in any forum, the USA forum is here in case of local regs or laws

commercial pictures ?

That would be the sensible way:wink_smile:
I have never changed a head, its always a new pump which doesnt fit. Ends up needing positional flanges or stool pieces welded up.

A stool piece? Lol. Spell check is funny

I've not had that problem yet. I only fit Grundfos and they tend to look after the old pump bodies very well

I have replaced many heads and only 1 complete pump. But that wasn't a twin head
 
The joys of confined spaces.

photo (25).jpg
 
Added some more pics
They are 3x Strebel 500 boilers, 2x CT pump sets, 1xVT pump set with 3 port valve and Enwamatic.
You can see pictures of the header in the background on the last page:smug:
 
i was saying to someone about getting my commercial gas before years out and they said not worth it as only the bigger companies get the work.
been subbing a bit out of late and seems to me that its a better market than the domestic crap
 
Its near Weston super mare
I am self employed but work for my Dads company, who works for bigger companyies.
As a one man outfit I think you would be unlikley to get big boiler houses but I may be wrong.
 
I am just hanging the boilers and doing some welding.
Someone else will pipe them up as I am off to another job, I hopefully will get to come back and do the gas.
 

We recommend City Plumbing Supplies, BES, and Plumbing Superstore for all plumbing supplies.

Back
Top