HALL of SHAME PHOTo`s | Plumbing Jobs | The Job-board | Page 102 | Plumbers Forums

Welcome to the forum. Although you can post in any forum, the USA forum is here in case of local regs or laws

Discuss HALL of SHAME PHOTo`s in the Plumbing Jobs | The Job-board area at Plumbers Forums

c87b3005b4e51a8a242cca87cb6c1f5e.jpg
fc84ccac079fcb93d8436e25a97ff6d7.jpg


Cylinder change I did today.

The electrics had been bodged together and the 15mm vent pipe terminated above the tank lid so there was a lovely puddle on top of the tank.

Shocking!
 
image.jpg I know it's not plumbing related but how about this for a bit of a quality workmanship. It's my daughters alleged kitchen, the crack in the plaster kept getting wider , think we know why !!!
 

Attachments

  • image.jpg
    image.jpg
    95.5 KB · Views: 326
Custard wanted me to change kitchen mixer. I said sure but only if I can change the rest of the pipe work too. Flexi hoses joined to flexi hoses! Magic. Custard declined re piping.

image.jpg

image.jpg
 
I would have said the same paul I think! no chance I would put my name to that you can more or less guarantee once you disturb the tap tails it will be like Niagara falls
 
Exactly when if your flue is leaking condensate is it ok to refix the flue clamp with silicone?
2npEnM.jpg

Maybe its around the same time your fitting placky pipe direct to an unvented cylinder.
aUri77.jpg

Also It is a good thing you dont have to spend money on broken tundishes any more just pop a small funnel in the open end of d2.
vpQs4k.jpg

Got to love rental property and their "maintenance men".
 
Last edited:
Is that a 4 burner job guy or 5 burner job lol
 
Looks like a diyer used the old bit they had lying around off an old one doesnt it ,,
 
5 burner. Massive house I mean massive. Upstairs hallway was almost size of my living room. 20m long and 5m wide! His house was heated by 2 33kw COMBI boilers feeding six huge bathrooms. Bath shower sink and bidet in every one ...... 25mm mains. It was done by same pro who linked both boilers together with hep!
 
5 burner. Massive house I mean massive. Upstairs hallway was almost size of my living room. 20m long and 5m wide! His house was heated by 2 33kw COMBI boilers feeding six huge bathrooms. Bath shower sink and bidet in every one ...... 25mm mains. It was done by same pro who linked both boilers together with hep!
you have a living room 20m x5m!!

heated by a 600x400mm single :party:
 
Last edited:

Similar plumbing topics

  • Article
Baxi duo tec compact and a combimate 7 year...
Replies
1
Views
481
  • Question
Thank you, I’ll do just that. Much appreciated
Replies
2
Views
349
  • Question
There's no leaks anywhere above it. The water...
Replies
3
Views
369
There is 6 pipes under the boiler and one goes...
Replies
19
Views
1K
Back
Top