Not paying for a job | General Plumbing Jobs Discussion | Page 4 | Plumbers Forums

Welcome to the forum. Although you can post in any forum, the USA forum is here in case of local regs or laws

  • Thread starter TripleD
  • Start date
  • Replies 121
  • Views 16K

Discuss Not paying for a job in the General Plumbing Jobs Discussion area at Plumbers Forums

Status
Not open for further replies.
Another rushed bodged bathroom. Total and unequivocal rip out and redo.

Don't pay him his labour, he made the decision not to get paid by rushing and bodging. Look at the state of those tile trim mitres.

I say mitres, he hasn't even bothered!
 
It's rough indeed. I think, though, he'd have got away with it if it only hadn't leaked. To smear more silicone on top of old and leave it that rough is not excuseable - there is no reason not to make it look neat.

I wonder whether the plumber has developed dementia or something - this does not look like even an experienced DIYers work. Or he has no experience whatsoever.
 
Stramitt board is awful stuff to tile to, but it can be done.

Mix powdered flexii adhesive with a water and SBR mix (like a slurry) apply a thin coat, ike plaster. When dry tile as normal.
 
Stramitt board is awful stuff to tile to, but it can be done.

Mix powdered flexii adhesive with a water and SBR mix (like a slurry) apply a thin coat, ike plaster. When dry tile as normal.

I've come across it once but never tiled to it, I don't think I'd dare for fear of problems. What is the idea of this board? How old is the stuff? does it pre date plasterboard?
 
Easy to put up like the cardboard walls and didmt require much structure but you have to be careful as some did contain ab
 
from what ive read, looks like the walls should of been stripped off to the bare stud work and wedi boarded, tiles don't just come loose and no amount of silicone will fix that, IMO its his fault for tiling on top of crap, he could argue the price in that no allowance was made for that but you wouldn't build a house on crap foundations and if you did then it would still be your fault! bathrooms aren't cheap and you certainly don't want to cut corners as you have found out, even though the o.p didn't cut corners as he probably thought it was all being taken care of professionally! sucks but IMO It all needs stripping out...
 
Is this stuff attached to studwork? or is it some kind of prefabricated eggbox and straw wall?

If it can be simply ripped back to studwork I cant understand why he didn't do this.
 
it's rubbish work but i see every bit as bad work every day. if it hadn't leaked and the tiles had stayed put for 12 months he'd have probably got away with it as it would have just been "bad finishing."

the flexi is fit to burst but there are currently 50 billion out there in the same condition happily biding their time. i change one that burst this morning. bank holiday monday call out thank you very much what what.
 
Is this stuff attached to studwork? or is it some kind of prefabricated eggbox and straw wall?

If it can be simply ripped back to studwork I cant understand why he didn't do this.

not may studs/ timbers they come in i think 8 foot by 4 panels so every 4 foot theres a timber
 
Definitely rip out. but possibly not all.
Get some proper quotes, you may only have to replace a few rows of tiles.
Seems odd to me to silicon inside and outside of shower enclosure.
flexi's will definitely have to be replaced.
IMO, you should compromise on materials, NOT labour. Move on, get several quotes and start a new year on a positive note
 
Oh dear. It's all been said earlier but here are a couple of tips and hints for the future. And for my 2 cents worth: you will never make that job any good without ripping it out and starting from scratch. You will never make that mess look good. Personally I detest poly wall panel I think it looks poor and I hate working with it.

With the amount of water leaked into the walls and floor it will take some time to dry out. And it must be dry before further work is started. I have only come across a similar material once before and due to a slow leak from a cwt the wall actually started to grow, swell, and sprouted. It was made from hay I believe. Judging by the black mould in the video, is this leak new or just worse?

Check to see if a fitter has a public liability insurance that covers the trades that you are paying for. If not then do not use him. If he has then you can claim against his insurance to have the work done again due to the damage he has caused.

Also some PLI have what's known as an efficacy clause. This insurers for bad workmanship.

Did you get a Building Reg Prt P cert from the electrician? If not then chase him up for it. He has a limited time to register your work. If he is not part of the self cert scheme you will need to get building controls in to cert the work. Average cost in the UK is £150 to £350 for that. Legally You will need that cert if you sell the property.

Check to see that the aqualisa shower was fitted as per manufacturers exact spec. If not the 5 year warranty will be invalid. As a retired aqualisa approved installer I can tell you they are getting much stricter with that. BTW the aqualisa web site is a good place to find an approved bathroom installer.

Consider making a claim on your buildings insurance for the water damage if your installer does not have a valid PLI. You may recover all your costs that way.

Normally I tend to side with the tradesman in these disputes but if everything you have told us is the truth and you would need to swear to that in court, then I think you have been badly done by. If you do go to court you are entitled to legal representation, the cost of which is reclaimable. Most house insurance has that thrown in anyway.

I would not entertain any further visits from your man.
 
If it was me coming to sort that out then it would be getting taken out, cleaned up the fitted back in properly. That would be the only option id offer
 
Oh dear. It's all been said earlier but here are a couple of tips and hints for the future. And for my 2 cents worth: you will never make that job any good without ripping it out and starting from scratch. You will never make that mess look good. Personally I detest poly wall panel I think it looks poor and I hate working with it.

With the amount of water leaked into the walls and floor it will take some time to dry out. And it must be dry before further work is started. I have only come across a similar material once before and due to a slow leak from a cwt the wall actually started to grow, swell, and sprouted. It was made from hay I believe. Judging by the black mould in the video, is this leak new or just worse?

There was a leak originally which was why we looked at getting a whole new bathroom. We advised all fitters of this when they came round, and pointed out the issues plus the type of walls they were dealing with.

Check to see if a fitter has a public liability insurance that covers the trades that you are paying for. If not then do not use him. If he has then you can claim against his insurance to have the work done again due to the damage he has caused.

Also some PLI have what's known as an efficacy clause. This insurers for bad workmanship.

I didn't check these, how do I find out if they have insurance? or is this only done by contacting them and requesting it?

Did you get a Building Reg Prt P cert from the electrician? If not then chase him up for it. He has a limited time to register your work. If he is not part of the self cert scheme you will need to get building controls in to cert the work. Average cost in the UK is £150 to £350 for that. Legally You will need that cert if you sell the property.

I have checked this, the job has been registered so I have been told.

Check to see that the aqualisa shower was fitted as per manufacturers exact spec. If not the 5 year warranty will be invalid. As a retired aqualisa approved installer I can tell you they are getting much stricter with that. BTW the aqualisa web site is a good place to find an approved bathroom installer.

I have been looking round for trades today to come in and quote for the remedial work, I have asked them to check all aspects of the plumbing work, separately I have been looking for a tiler via the checkatrade website hopefully they can advise on what needs to be done.

Consider making a claim on your buildings insurance for the water damage if your installer does not have a valid PLI. You may recover all your costs that way.

Normally I tend to side with the tradesman in these disputes but if everything you have told us is the truth and you would need to swear to that in court, then I think you have been badly done by. If you do go to court you are entitled to legal representation, the cost of which is reclaimable. Most house insurance has that thrown in anyway.

I would not entertain any further visits from your man.

Thank you for your advice, never thought about Buildings Insurance claim, I will see what the cost of the work will come to, and make a decision from their.
What I have put is the truth, I thought this site would be full or trades people that will just back each other, but I wanted to get some advice from proper trades people on which way I should take this, and everyone has given useful advice, and things I hadn't thought of. Ripping out and starting again isn't something I really relish, but if that's how it gets sorted properly, then that's the way it will have to be.

Just hope second time round it will all work out.
 
If you do need evidence of bad workmanship for court, take plenty of photographs at all stages of removal and also get reports from experts (qualified plumbers and other trades).
Courts won't just accept your word
 
Don't use checkatrade for references, ask your neighbours if they have had any work. Or know anyone. Personal recommendation is always best.
Ask the new guy for examples of his work and contact those customers to confirm!

You won't offend, I get asked for pictures of my work on bathrooms all the time.
 
Don't use checkatrade for references, ask your neighbours if they have had any work. Or know anyone. Personal recommendation is always best.
Ask the new guy for examples of his work and contact those customers to confirm!

You won't offend, I get asked for pictures of my work on bathrooms all the time.

What's wrong with Checkatrade? I'm on I don't bodge things, rip people off leave leaks (or if I do by mistake I sort it)
 
What's wrong with Checkatrade? I'm on I don't bodge things, rip people off leave leaks (or if I do by mistake I sort it)

All I'm saying is the best way of checking someone's work is to see it.
 
All I'm saying is the best way of checking someone's work is to see it.

I agree but unless you take people round to jobs that you have done how do they know that's your work off photos and not something you have pinched off the internet?
 
There was a leak originally which was why we looked at getting a whole new bathroom. We advised all fitters of this when they came round, and pointed out the issues plus the type of walls they were dealing with.



I didn't check these, how do I find out if they have insurance? or is this only done by contacting them and requesting it?



I have checked this, the job has been registered so I have been told.



I have been looking round for trades today to come in and quote for the remedial work, I have asked them to check all aspects of the plumbing work, separately I have been looking for a tiler via the checkatrade website hopefully they can advise on what needs to be done.



Thank you for your advice, never thought about Buildings Insurance claim, I will see what the cost of the work will come to, and make a decision from their.
What I have put is the truth, I thought this site would be full or trades people that will just back each other, but I wanted to get some advice from proper trades people on which way I should take this, and everyone has given useful advice, and things I hadn't thought of. Ripping out and starting again isn't something I really relish, but if that's how it gets sorted properly, then that's the way it will have to be.

Just hope second time round it will all work out.

You should receive a form from the electrician which is a self certification form issued by one of the only two bodies in the UK legally authorised to do so. NIECC AND NAPPI. The tradesman has to submit this form to the organisation and a few weeks later you will get a cert from building control. The trade has to give you that paperwork. If they don't you need to report this to building control. They will prosecute.

Ask trades for copies of their insurance. I always supplied one with the estimate, not offended or suspicious if asked. In fact proud to give it, also same for certs of qualifications, references etc etc.

Don't reckon check a trade etc etc. Too easy to fake results imho.

Also imho tilers are tilers. Builders are builders. Word of mouth and personal recommendations are always the best imho. You're local trading standards will have a list of qualified trades. So will building control. Well they do in Hertfordshire anyway.
 
Sorry to resurrect my thread, but an update on proceedings.
On the 5th Jan I issued a letter to the fitter stating the issues we found, and our intent to withhold payment it was reviewed but other professionals, if the quote for rectification work was under the invoice amount, we would subtract this from the invoice and pay the remainder.

No answer to letter.

We had a family recommended plumber to quote, the shower has all been plumbed incorrectly so warranty is void, pipes not lagged etc. Has quoted for work.
Recommended tiler laughed at pictures of before, said there's 2 choices, Tiler Backer/Aqua panel 12mm put onto wall, and then tiled over or replace wall.
Also have the shower screen manufacturers technician visit to review the shower screen, he noted the amount of silicone, said it had not been fitted correctly, pointed out the thick bead of silicone on the outside was to cover the holes that had been drilled in the tiles where the screen had been incorrectly fitted, and said it's still not fitted correctly.

Total for rectifying work is £1800

Sent follow up letter to fitter stating this, and formally refusing payment. So as not to have this dragging on we have suggested that he can keep the £250 deposit and that is the matter finished with him and allows us to commission the repair work. He has 10 working days to respond of which 5 is over currently. No response as yet.

I did see his van this morning when walking the dog, felt like warning the home owner, but not sure that's my place to do so.
 
Sounds fair and reasonable - from what you have told us.

You may want to get legal advice to make sure you are acting within the Law.
You may want to get a lawyer to send letters for you.

As for warning the other homeowner about your experiences - don't get involved.
If they ask you, tell them as much as you dare
 
As for warning the other homeowner about your experiences - don't get involved.
If they ask you, tell them as much as you dare

True, best keep out of it. I just want my situation sorted.

As for the solicitor, I could but it's all additional cost on my side to do that. Ideally he responds accepting the situation, and the agreement is made. I need to tread carefully after 10 days, but checking with the CAB it's best to make an agreement outside of solicitors.
 
Status
Not open for further replies.

Similar plumbing topics

There is 6 pipes under the boiler and one goes...
Replies
19
Views
1K
I feel for you, it's a bad position to be in...
Replies
18
Views
3K
  • Question
Also I don't think he'll be able to get a bit...
Replies
12
Views
2K
  • Question
No, don’t just fix into tiles. Drill 6mm hole...
Replies
21
Views
2K
F
  • Question
Thanks I'll try that. Appreciated
Replies
6
Views
1K
FrankMcg
F
Back
Top