- Messages
- 51
well Collin came.. and soon started draining the system.... by 10:00 am the company asked for payment.. Collin wasn't pleased. I just said he hadn't finished yet.
I flushed it out with cleaner and then put inhibitor in about 6 months ago... I glanced over to see what colour the water was coming out and pleased to see it clear....
He started at 9:00 am and finished at about 4:30 pm. getting air out of the system was a pain.. boiler shutting down till the air got shifted. He was ultra considerate and gave us some tips on a few operational things...
I thought he worked hard and cleanly... I bunged him £40..
I flushed it out with cleaner and then put inhibitor in about 6 months ago... I glanced over to see what colour the water was coming out and pleased to see it clear....
He started at 9:00 am and finished at about 4:30 pm. getting air out of the system was a pain.. boiler shutting down till the air got shifted. He was ultra considerate and gave us some tips on a few operational things...
I thought he worked hard and cleanly... I bunged him £40..