I have a insurance job to try and rescue a poorly installed quad shower the customer wants to save the tiling if possible and has a few spare so fingers crossed it may work , the loss adjuster allowed em £1500 that will just about cover materials. Kop
Never been tested till you try to get the baffles out of a new style worcester camray that's not been touched for a few years. Need to be a magician 🤣🤣🤣
Always a challenge mate when they get that bad . Kop
Post automatically merged:
Had me own problems today Shaun i fitted the combination units damage on the back panel on the toilet , then went to fit the ceramic top to find it like a banana cracked and chipped grrrr been a bit of a challenge this one client came home today so smooth ed it over with them should have a new top by Tuesday 😜 kop
Post automatically merged:
Nearly there with this one replacement basin top coming Tuesday 🤞start another one Monday 🥴
Have a restful weekend chaps . Kop
Always a challenge mate when they get that bad . Kop
Post automatically merged:
Had me own problems today Shaun i fitted the combination units damage on the back panel on the toilet , then went to fit the ceramic top to find it like a banana cracked and chipped grrrr been a bit of a challenge this one client came home today so smooth ed it over with them should have a new top by Tuesday 😜 kop
Post automatically merged:
Nearly there with this one replacement basin top coming Tuesday 🤞start another one Monday 🥴
Have a restful weekend chaps . Kop
I like that all in one sink worktop mate. Where is it from? I’m replacing a shower cubicle This week, but they are Keeping the same toilet and basin but new tiles behind.
Always a challenge mate when they get that bad . Kop
Post automatically merged:
Had me own problems today Shaun i fitted the combination units damage on the back panel on the toilet , then went to fit the ceramic top to find it like a banana cracked and chipped grrrr been a bit of a challenge this one client came home today so smooth ed it over with them should have a new top by Tuesday 😜 kop
Post automatically merged:
Nearly there with this one replacement basin top coming Tuesday 🤞start another one Monday 🥴
Have a restful weekend chaps . Kop
I like that all in one sink worktop mate. Where is it from? I’m replacing a shower cubicle This week, but they are Keeping the same toilet and basin but new tiles behind.
Sweet H sink work top is From elation bathrooms via plumb city mate, i have another one of these next week but strangely enough it's a shower out and shower bath going in should be interesting. 👍. Kop
Start wetroom on Monday. On the way home monday night fix a leaky pump and look at a bath out walk in shower in. Tuesday night pump up ev on an unvented followed by changing a basin mixer and looking a bathroom refit. Wednesday night fix a leaking toilet on way home.
Oh plus tomorrow moving 3 rads on a biomass system.
Yes, theres an external biomass boiler and then the tank in the cellar. They're having the kitchen done so wanted two new rads, luckily right above the plant room.
Put this one to bed today replaced the rad for a towel rail to give a bit more room at the loo fished all the fiddly bits off 😆 turned out pretty good considering what I had to work with. Cheers chaps kop