Welcome to the forum. Although you can post in any forum, the USA forum is here in case of local regs or laws

What we all working on this week ?

king of pipes

Esteemed
Plumber
Gas Engineer
Subscribed
I have a insurance job to try and rescue a poorly installed quad shower the customer wants to save the tiling if possible and has a few spare so fingers crossed it may work , the loss adjuster allowed em £1500 that will just about cover materials. Kop
 

Attachments

  • Screenshot_20191031-033038.png
    Screenshot_20191031-033038.png
    400.3 KB · Views: 298
  • Screenshot_20191031-033046.png
    Screenshot_20191031-033046.png
    420 KB · Views: 142
yes mate but not installed correctly for my liking (tilers installed it)

should be glued to the floor with either mi approved foam or tile addy

its all plastic so install isnt the best

would love something to get my teeth in atm but flip side back to site tomorrow so should be happy
Thin layer of tile adhesive then screwed for me mate. How did they do it?
 
This week and last week contracted Viral Gastroenteritis never been so ill for so long. So I have spent the time designing Top Up Mate 2. Been stuck at home for 10 days uck little sleep hence posts at 2/3/4 am during this week. PF helped keep me sane...well relatively Centralheatking
 
Sorting this heap of junk out new drain down valve as other was leaking and the gas valve has gone and it’s on end of life from hammers so trying to find one, think I’ve sorted it trying an ideal concord gas valve 😀
 

Attachments

  • 5B1D1E1A-DC3A-43D4-AD87-DB99D3FC313D.jpeg
    5B1D1E1A-DC3A-43D4-AD87-DB99D3FC313D.jpeg
    132.1 KB · Views: 42
  • EC36C826-B377-4503-8B30-D5F97869AAF3.jpeg
    EC36C826-B377-4503-8B30-D5F97869AAF3.jpeg
    116.3 KB · Views: 44
I have finished Top Up Mate 2 ready for testing pre production screening and certification feel better
Next week finalizing details for export of our solar and roofing system to the Middle East, after everbody is lined up I am off to Skibbereen for a while and leave them to deal with the small details.
I will raise a glass of Murphy’s or 10 to you all have a good weekend Centralheatking
 
I have finished Top Up Mate 2 ready for testing pre production screening and certification feel better
Next week finalizing details for export of our solar and roofing system to the Middle East, after everbody is lined up I am off to Skibbereen for a while and leave them to deal with the small details.
I will raise a glass of Murphy’s or 10 to you all have a good weekend Centralheatking
Glad your feeling better CHK good luck with the new design mate. cheers kop
 
Glad your feeling better CHK good luck with the new design mate. cheers kop
Thanks KOP my illness was a long dark tunnel for 3 weeks but I am feeling better another 2 weeks to get things right business wise then of to West Cork. I have today put the export to Iraq in charge of an export agent whom my friend an international scaffolding contractor uses and whom will look after it
For me. Cheers Centralheatking
 

We recommend City Plumbing Supplies, BES, and Plumbing Superstore for all plumbing supplies.

Subscribe to email updates

Back
Top