king of pipes

Esteemed
Plumber
Gas Engineer
Subscribed
Messages
6,156
I have a insurance job to try and rescue a poorly installed quad shower the customer wants to save the tiling if possible and has a few spare so fingers crossed it may work , the loss adjuster allowed em £1500 that will just about cover materials. Kop
 

Attachments

  • Screenshot_20191031-033038.png
    Screenshot_20191031-033038.png
    400.3 KB · Views: 277
  • Screenshot_20191031-033046.png
    Screenshot_20191031-033046.png
    420 KB · Views: 125
  • Like
Reactions: Dan
Does it re circ the water ?
 
No, it could do if they had the water storage capacity but they are restricted with space.

so just goes to drain how are they handling the back flow risk ?
 
It’s not my day today :D

finished the boiler off and come to fire it up no oil flow either someone’s forgot to order some or someone’s nicked it which do you think the builders sticking to :D

and then my testo decides to crap itself only just come back from service

I like the lockshield valve on leg to exp vessel - great!

What's the mini shock arrester for?
 
I like the lockshield valve on leg to exp vessel - great!

What's the mini shock arrester for?

cold mains into the boiler always fit them due to quarter turn cartridges
 
so just goes to drain how are they handling the back flow risk?
so just goes to drain how are they handling the back flow risk ?
Do you mean for the CW supply or drainage? The machine empties into a settlement tank and then into a Drainmajor which will pump it up about 5m to a soil stack in the building. CW wise, I'm undecided what fluid risk it is at the moment. It doesn't actually hold any water as such, it just fills at a steady rate from the top of the drum and discharges out of the bottom through an open waste. Its not possible for it to over fill into the machine itself as the water just runs straight out of it. Id like it to be CAT 3, but it might be CAT 4
 
Do you mean for the CW supply or drainage? The machine empties into a settlement tank and then into a Drainmajor which will pump it up about 5m to a soil stack in the building. CW wise, I'm undecided what fluid risk it is at the moment. It doesn't actually hold any water as such, it just fills at a steady rate from the top of the drum and discharges out of the bottom through an open waste. Its not possible for it to over fill into the machine itself as the water just runs straight out of it. Id like it to be CAT 3, but it might be CAT 4

any cleaning chemicals or is it just rocks ?
 
any cleaning chemicals or is it just rocks ?
Both, the drum
any cleaning chemicals or is it just rocks ?
It uses aggregate and chemicals, but they don’t mix with the water before going into the mixing drum, they both have separate supply lines so I can’t see any risk of contamination. I’d say that there is less risk than you would get with say a dish washer or washing machine, I might just fit a double check valve. The other option is an RPZ valve but they are pricey and not so easy to get hold off.
 
Where’s the fill port below the spill level or above ?
 
Replacing a pump in a pressurisation unit this morning, got to site and the bottom pan is nearly rusted through! Couldn't get spray paint in blue so white will have to do 🙄

Pressure Unit Repair.jpg
 

Attachments

  • Pressure Unit Repair-2.jpg
    Pressure Unit Repair-2.jpg
    608.4 KB · Views: 38
  • Pressure Unit Repair-3.jpg
    Pressure Unit Repair-3.jpg
    545 KB · Views: 30
  • Pressure Unit Repair-4.jpg
    Pressure Unit Repair-4.jpg
    442.6 KB · Views: 30
  • Pressure Unit Repair-5.jpg
    Pressure Unit Repair-5.jpg
    615.2 KB · Views: 36
Made a bit of progress
Grouting these up today i can't finish em completely as family issues have forced me to stop working from today , got metros finished done on the opposite wall but still a good couple of days to complete the job ☹️
 

Attachments

  • PXL_20201216_164917540.jpg
    PXL_20201216_164917540.jpg
    300.5 KB · Views: 30
  • PXL_20201217_144102181.jpg
    PXL_20201217_144102181.jpg
    249.3 KB · Views: 35
Well, it's done.

Before and after.
 

Attachments

  • 20201012_124711.jpg
    20201012_124711.jpg
    354.2 KB · Views: 30
  • 20201012_124707.jpg
    20201012_124707.jpg
    389.9 KB · Views: 26
  • 20201012_124701.jpg
    20201012_124701.jpg
    319.8 KB · Views: 30
  • 20201218_174410.jpg
    20201218_174410.jpg
    371 KB · Views: 31
  • 20201218_174356.jpg
    20201218_174356.jpg
    466.7 KB · Views: 30
  • 20201218_174333.jpg
    20201218_174333.jpg
    336.6 KB · Views: 28

Similar plumbing topics

  • Question
Very hard to follow your post Tina. What...
Replies
18
Views
4K
  • Question
Yes, The size of the external expansion...
Replies
17
Views
10K
No, I believe you absolutely. My own problem...
Replies
9
Views
306
  • Question
The customer had a Mira Sport they had bought...
Replies
14
Views
303
    • Like
  • Locked
Have another guy working for me but on this...
2
Replies
25
Views
5K
Back
Top