Welcome to the forum. Although you can post in any forum, the USA forum is here in case of local regs or laws

What we all working on this week ?

king of pipes

Esteemed
Plumber
Gas Engineer
Subscribed
I have a insurance job to try and rescue a poorly installed quad shower the customer wants to save the tiling if possible and has a few spare so fingers crossed it may work , the loss adjuster allowed em £1500 that will just about cover materials. Kop
 

Attachments

  • Screenshot_20191031-033038.png
    Screenshot_20191031-033038.png
    400.3 KB · Views: 291
  • Screenshot_20191031-033046.png
    Screenshot_20191031-033046.png
    420 KB · Views: 138
Shower room finished off customer getting his own flooring done , I had to swap the door around which was a pita want that little bit more room to get in and out ?? Regards kop
 

Attachments

  • IMG_20230419_100317641_MFNR.jpg
    IMG_20230419_100317641_MFNR.jpg
    242.6 KB · Views: 55
  • IMG_20230419_100305833_MFNR.jpg
    IMG_20230419_100305833_MFNR.jpg
    323.7 KB · Views: 57
  • IMG_20230419_100344969_MFNR.jpg
    IMG_20230419_100344969_MFNR.jpg
    543.9 KB · Views: 56
Thought it might be salvageable, but damage too severe. Insurance job so new boiler. Fire investigator was there when I called in. No accelerants, didn't start from boiler or oil line, possibly a lithium battery in wheelie bin but cause is officially unexplained. Luckily the boiler stopped the propane tanks exploding.
 

Attachments

  • 20230421_122738.jpg
    20230421_122738.jpg
    778.6 KB · Views: 65
  • 20230421_122732.jpg
    20230421_122732.jpg
    1 MB · Views: 72
Thought it might be salvageable, but damage too severe. Insurance job so new boiler. Fire investigator was there when I called in. No accelerants, didn't start from boiler or oil line, possibly a lithium battery in wheelie bin but cause is officially unexplained. Luckily the boiler stopped the propane tanks exploding.
Ooh it could of been a whole lot worse then mate 😕
 
Well there's an hour I won't get back.
Asked to have a look at first fixing for a bathroom and en-suite.
No hot, cold, waste or soil pipework upstairs.
Saniflo for ensuite.
Hot and cold to be picked up from by the boiler and ran through pitched single storey roof space, tee off into ensuite and then into bathroom.
En-suite has thermo shower, basin and wc.
Bathroom has bath, electric shower over, basin and wc.
New 4" soil from wc in bathroom drop into roof space, drop through ceiling, run just below ceiling, core through external wall, tee, new stack only 1 story and connect into existing stack 2m away.
Plus waste pipes for above and connection and pipe for saniflow.
Gives me the plan, attached, then tells me he has a price already. £1,350.00. I told him to snap his hand off.
 

Attachments

  • WIN_20230425_19_03_56_Pro.jpg
    WIN_20230425_19_03_56_Pro.jpg
    157.3 KB · Views: 62
Second fixing week
 

Attachments

  • C564A98E-A49E-4D61-901A-9B78B3CDF1A8.jpeg
    C564A98E-A49E-4D61-901A-9B78B3CDF1A8.jpeg
    367.9 KB · Views: 67
  • 1AB13DB3-38EF-4DBC-B768-58ADA960DBC7.jpeg
    1AB13DB3-38EF-4DBC-B768-58ADA960DBC7.jpeg
    298.8 KB · Views: 63
  • 8CD0168D-2906-41C6-9C0C-5634055B528B.jpeg
    8CD0168D-2906-41C6-9C0C-5634055B528B.jpeg
    494.3 KB · Views: 74
  • 524F307A-4E2B-4D45-8D2A-35591B9F90D8.jpeg
    524F307A-4E2B-4D45-8D2A-35591B9F90D8.jpeg
    221.4 KB · Views: 65
Cheers.

List 2 cases for 10.00 and mines the second, typical. Turned up in my work gear as well to hopefully move things along 😀
Their rep requested a private meeting with mine to discuss settlement. I said nope.
I've paid for the hearing, there offering less than 50%.
 
Well it was a win, not the full win but enough to be happy about it. Found in my favour. At one point though I thought I was getting the death penalty, the barrister was a right obstreperous thomas watt.
 
Well it was a win, not the full win but enough to be happy about it. Found in my favour. At one point though I thought I was getting the death penalty, the barrister was a right obstreperous thomas watt.
Glad my parents decided against naming me anything starting with the letter T.
 
Bathroom refurb, first of a few for same customer. Once this one's done its downstairs for a new ensuite.
Strange 15mm mlcp pipe been used previously, all with brass push fits.
 

Attachments

  • 16844202802881467018235667305632.jpg
    16844202802881467018235667305632.jpg
    259.4 KB · Views: 61
  • 1684420302448867079728183207990.jpg
    1684420302448867079728183207990.jpg
    385.5 KB · Views: 58
  • 16844203235367657944466520470229.jpg
    16844203235367657944466520470229.jpg
    281.6 KB · Views: 69

We recommend City Plumbing Supplies, BES, and Plumbing Superstore for all plumbing supplies.

Back
Top